FieldProspects
Dataset

US planned power projects database

The FieldProspects planned power projects database holds 8,057 planned generating units in 51 states, totaling 1,547.4 GW of proposed capacity. Solar (568.6 GW) and Battery Storage (435.8 GW) lead by capacity. A developer is attributed to 50.8% of the units. Figures are as of October 2026.

Data as of

What the planned projects table contains

Each row is one planned generating unit, not a whole plant. The source for projects, EIA Form EIA-860M, reports at generator level, so a large solar farm or battery site can appear as several rows. The table spans 24 technologies, 51 states and 47 grid operators and balancing authorities, and 7 rows name no grid.

Of the rows, 5,726 (1,255.5 GW) come from the interconnection queues of ERCOT, PJM, MISO, CAISO, SPP, NYISO and ISO-NE, and 2,331 (291.9 GW) come from the planned generator list in EIA-860M. Capacity is stated for 98.6% of rows, and every capacity total on this page adds up only the rows that state one.

Timing is less certain. 95.6% of rows carry an expected in-service year, 1,081 units totaling 162.3 GW show an expected year before 2026 yet are still listed as planned, and 353 have no year at all. Coordinates exist for 28.9% of planned units, against 100% of operating ones, so most planned projects are placed by state, county and grid rather than by coordinates.

Planned capacity by technology

Planned generating units by technology
TechnologyUnitsCapacityShare of capacity
Solar 3,475 568.6 GW 36.7%
Battery Storage 2,444 435.8 GW 28.2%
Natural Gas 870 273.2 GW 17.7%
Wind 613 158.1 GW 10.2%
Solar + Storage (Hybrid) 263 46.1 GW 3%
Nuclear 20 29.2 GW 1.9%
Transmission 94 12.6 GW 0.8%
17 other technologies 278 23.8 GW 1.5%

Solar and battery storage together hold 64.9% of planned capacity. Hybrid projects that pair a technology with storage are a technology of their own in this table.

Where the planned capacity is

The ten states with the most planned capacity
StateUnitsCapacityShare of capacity
Texas 2,457 555.1 GW 35.9%
California 699 146.1 GW 9.4%
Illinois 512 97.2 GW 6.3%
Virginia 364 63 GW 4.1%
Indiana 301 59.2 GW 3.8%
Michigan 270 45.9 GW 3%
Ohio 178 41.5 GW 2.7%
Oklahoma 184 38.7 GW 2.5%
New York 346 36 GW 2.3%
Louisiana 164 35.6 GW 2.3%

Planned capacity by grid operator

The seven grid operators with the most planned capacity
Grid operatorUnitsCapacityShare of capacity
ERCOT 2,359 532.2 GW 34.4%
Midcontinent ISO (MISO) 1,684 301.4 GW 19.5%
PJM Interconnection 1,492 260.3 GW 16.8%
California ISO (CAISO) 780 186.2 GW 12%
Southwest Power Pool (SPP) 669 129.4 GW 8.4%
New York ISO (NYISO) 376 44.4 GW 2.9%
ISO New England 131 16.9 GW 1.1%

These seven hold 7,491 of the 8,057 planned units and 95% of planned capacity.

When planned capacity is expected to be in service

Planned units by expected in-service year
Expected yearUnitsCapacityShare of capacity
2026 1,233 151.4 GW 9.8%
2027 1,716 271.3 GW 17.5%
2028 1,692 352.3 GW 22.8%
2029 1,058 249 GW 16.1%
2030 639 165.7 GW 10.7%
2031 195 66.4 GW 4.3%
2032 and later 90 50.9 GW 3.3%
Year before 2026, still listed as planned 1,081 162.3 GW 10.5%
No expected year listed 353 78.1 GW 5%

The year is the one given by the source for each unit. It is an expectation, not a commitment.

How complete the planned table is

Planned projects: rows with a value in each field
Capacity 98.6% (7,943 of 8,057)
County 99.6% (8,024 of 8,057)
Grid (balancing authority) 99.9% (8,050 of 8,057)
Developer attributed 50.8% (4,095 of 8,057)
Expected in-service date 95.6% (7,704 of 8,057)
Interconnection request date 70.2% (5,660 of 8,057)
Interconnection agreement stated 45.6% (3,672 of 8,057)
Coordinates 28.9% (2,331 of 8,057)

The full field-by-field breakdown for every table is on the coverage page.

What is a planned power project?

A planned power project is a generating, storage or transmission unit that has been proposed and is listed in a grid operator interconnection queue or in EIA Form EIA-860M as planned, but is not yet in service. In this table each unit is one row.

What approved accounts can do with it

Members filter this table by state, grid, developer, capacity, county and year, switch to a map, and export the filtered result to CSV or Excel. The seven-day trial includes an export of up to 250 rows. Every account is reviewed by hand.

Source. U.S. Energy Information Administration Form EIA-860M and ISO/RTO interconnection queues, compiled by FieldProspects.