Tarrant County, Texas has 1.4 GW of data centers on record, planned to operating, across 29 records, against 1.5 GW of generation operating inside the county. The queue adds 791.6 MW of planned generation across 4 projects. That is 1.4% of Texas's data center MW.

Data as of Grid region: ERCOTRefreshed monthly
1.4GW
data centers, planned to operating
29
data center records, not cancelled
1.4%
of Texas's data center MW
1.5GW
operating generation, 69 projects
791.6MW
planned generation, 4 projects
11
data center developers active here
Map

Tarrant County and its neighbors

Counties shaded by data center MW on record, planned to operating. 6 of its 6 neighboring counties have pages of their own. The rest are in the member database.

Wise no data centers Ellis 5.3 GW Tarrant 1.4 GW Dallas 4 GW Parker no data centers Johnson no data centers Denton 909.5 MW
no data center MWunder 100 MW100 to 1,000 MW1,000 to 5,000 MW5,000 to 15,000 MW15,000 MW or more no page yet

Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers

Headline finding
97%

of the generation operating in the county is matched by data center MW on record: 1.4 GW of data centers against 1.5 GW of plants, with 791.6 MW more planned.

Data centers, planned to operating1.4 GW
Operating generation1.5 GW
Planned generation791.6 MW

Data centers by status

29 records, 1.4 GW

Operating432 MW13 records, 30%
Under construction170.4 MW2 records, 12%
Planned830 MW14 records, 58%
Who owns each of the 29 records?Campus names, developers and contacts are for members.See what members get

The data center pipeline

21 records list a year online or expected, from 2017 to 2035. The largest expected additions are 373.2 MW listed for 2026 and 75 MW for 2027. 8 records list no year.

Figure 1

Data center MW by year online or expected

Records not cancelled, by listed year. 2026 onward is planned or under construction.

Through 20252026 and later
0100200300400 Snapshot year 102 2017 2019 96 2021 2023 2025 373 2027 2029 2031 2033 2035
View as table
YearRecordsMW
20172102
2018290
201900
2020296
202100
202210
202300
202400
202515
20266373
2027175
2028136
202900
2030170
2031170
203200
2033170
2034170
2035170
Source. FieldProspects database: ISO/RTO interconnection queues, EIA-860M and public data center filings, data as of October 8, 2026. 21 records with a year; 8 without are left out
Figure 2

Who is building in Tarrant

Data center developers by MW on record. Top 6 of 11.

ACS 350 MW 5 sites
PowerHouse 300 MW 4 sites
Meta 249 MW 5 sites
Prime Data Centers 144 MW 3 sites
CyrusOne 120 MW 2 sites
QTS 98 MW 2 sites
View as table
DeveloperSitesMW
ACS5350
PowerHouse4300
Meta5249
Prime Data Centers3144
CyrusOne2120
QTS298
Members see all 11 developers, each campus they own here, and the people who run their site selection and energy procurement.
Aggregates only. Campus names are for members.

Power generation in the county

69 plants operate inside Tarrant County, 1.5 GW. The queue adds 791.6 MW across 4 projects.

Figure 3

Operating and planned generation by technology

MW in Tarrant County

OperatingPlanned
Natural GasOperating 1.4 GW 64 projects
Battery StorageOperating 129.9 MW 4 projects
Battery StoragePlanned 791.6 MW 4 projects
SolarOperating 4 MW 1 project
View as table
TechnologyStatusProjectsMW
Natural GasOperating641,350
Battery StorageOperating4129.9
Battery StoragePlanned4791.6
SolarOperating14
Operating: 1.5 GW. Planned: 791.6 MW. Even if every planned project is built, county generation would reach 2.3 GW against 1.4 GW of data centers.
Source: ISO queues and EIA-860M, via FieldProspects
Figure 4

Planned generation by listed in-service year

MW. Years before 2026 are past due.

Past dueDue 2026 or later
0200400600 307 2027 484 2028
View as table
YearPlanned projectsMW
20271307.2
20283484.4
No planned project is past its listed year

Tarrant County against its neighbors

Ellis County has the most data center MW among the neighbors, 5.3 GW, more than Tarrant County. 4 of the 6 have more generation operating than data center MW on record.

CountyData center recordsData center MWOperating generation MWPlanned generation MWData center MW per MW operating
Ellis County 52
5,279
2,517
6,441 2.1x
Dallas County 68
4,041
2,070
2,025 2x
Tarrant County this page 29
1,432
1,484
792 0.97x
Denton County 14
910
1,110
401 0.82x
Wise County 0
0
2,237
4,377 0x
Johnson County 0
0
283
629 0x
Parker County 0
0
3
2,995 0x

Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.

7 counties shown

Every record in Tarrant County

Campus or project name, developer, status, MW, year and the developer’s contacts, for all 102 records. Filter, sort and export to Excel.

Members only
County: Tarrant County, TXStatus: all except cancelledSort: MW, largest first 102 records
Project or campusDeveloperStatusMWYearContacts
102 records and 3.7 GW behind this preview

Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.

Request access

Get alerts for Tarrant County

We email you when a data center or power project in Tarrant County is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Open every campus, project and contact in Tarrant County.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.