FieldProspects

Dallas County, Texas

Dallas County, Texas has 4 GW of data centers on record, planned to operating, across 68 records, against 2.1 GW of generation operating inside the county. The queue adds 2 GW of planned generation across 13 projects. That is 3.8% of Texas's data center MW.

Data as of Grid region: ERCOTRefreshed monthly
4GW
data centers, planned to operating
68
data center records, not cancelled
3.8%
of Texas's data center MW
2.1GW
operating generation, 44 projects
2GW
planned generation, 13 projects
21
data center developers active here
Map

Dallas County and its neighbors

Counties shaded by data center MW on record, planned to operating. 5 of its 6 neighboring counties have pages of their own. The rest are in the member database.

Ellis 5.3 GW Kaufman 200 MW Collin 629.5 MW Rockwall Tarrant 1.4 GW Dallas 4 GW Denton 909.5 MW
no data center MWunder 100 MW100 to 1,000 MW1,000 to 5,000 MW5,000 to 15,000 MW15,000 MW or more no page yet

Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers

Headline finding
2times

more data center MW than operating generation in the county. Dallas County's own plants cover 51.2% of the load on record, and the planned pipeline adds 2 GW.

Data centers, planned to operating4 GW
Operating generation2.1 GW
Planned generation2 GW

Data centers by status

68 records, 4 GW

Operating651.6 MW25 records, 16%
Under construction573.2 MW9 records, 14%
Planned2.8 GW34 records, 70%
Who owns each of the 68 records?Campus names, developers and contacts are for members.See what members get

The data center pipeline

40 records list a year online or expected, from 2010 to 2032. The largest expected additions are 819.1 MW listed for 2027 and 499.2 MW for 2028. 28 records list no year.

Figure 1

Data center MW by year online or expected

Records not cancelled, by listed year. 2026 onward is planned or under construction.

Through 20252026 and later
02505007501k Snapshot year 2010 2012 2014 2016 2018 2020 2022 2024 277 124 2026 819 499 2028 2030 2032
View as table
YearRecordsMW
201013
201110
201200
201312
20141105
201518
201600
201700
201800
2019160
202012
202100
2022160
202300
20243114
20256277
20264124
202712819
20285499
2029172
203000
203100
2032172
Source. FieldProspects database: ISO/RTO interconnection queues, EIA-860M and public data center filings, data as of October 8, 2026. 40 records with a year; 28 without are left out
Figure 2

Who is building in Dallas

Data center developers by MW on record. Top 6 of 21.

QTS 926.1 MW 12 sites
Lincoln Property Company 540 MW 1 site
Stream Data Centers 522.2 MW 8 sites
Skybox 352 MW 4 sites
Archer Datacenters 300 MW 1 site
Stack Infrastructure 280.8 MW 6 sites
View as table
DeveloperSitesMW
QTS12926
Lincoln Property Company1540
Stream Data Centers8522
Skybox4352
Archer Datacenters1300
Stack Infrastructure6281
Members see all 21 developers, each campus they own here, and the people who run their site selection and energy procurement.
Aggregates only. Campus names are for members.

Power generation in the county

44 plants operate inside Dallas County, 2.1 GW. The queue adds 2 GW across 13 projects.

Figure 3

Operating and planned generation by technology

MW in Dallas County

OperatingPlanned
Natural GasOperating 1.8 GW 27 projects
Natural GasPlanned 737 MW 1 project
Battery StorageOperating 260 MW 3 projects
Battery StoragePlanned 1.2 GW 10 projects
OtherPlanned 50 MW 1 project
OilOperating 10.8 MW 6 projects
SolarOperating 6.1 MW 5 projects
SolarPlanned 2.3 MW 1 project
Landfill GasOperating 4.2 MW 3 projects
View as table
TechnologyStatusProjectsMW
Natural GasOperating271,788.5
Natural GasPlanned1737
Battery StorageOperating3260
Battery StoragePlanned101,235.5
OtherPlanned150
OilOperating610.8
SolarOperating56.1
SolarPlanned12.3
Landfill GasOperating34.2
Operating: 2.1 GW. Planned: 2 GW. Even if every planned project is built, county generation would reach 4.1 GW against 4 GW of data centers.
Source: ISO queues and EIA-860M, via FieldProspects
Figure 4

Planned generation by listed in-service year

MW. Years before 2026 are past due.

Past dueDue 2026 or later
05001k1.5k Snapshot year 2 2026 2027 1,196 2028 817 2029 10 2030
View as table
YearPlanned projectsMW
202612.3
202700
202831,195.7
20298816.8
2030110
No planned project is past its listed year

Dallas County against its neighbors

Ellis County has the most data center MW among the neighbors, 5.3 GW, more than Dallas County. 3 of the 5 have more generation operating than data center MW on record.

CountyData center recordsData center MWOperating generation MWPlanned generation MWData center MW per MW operating
Ellis County 52
5,279
2,517
6,441 2.1x
Dallas County this page 68
4,041
2,070
2,025 2x
Tarrant County 29
1,432
1,484
792 0.97x
Denton County 14
910
1,110
401 0.82x
Collin County 20
630
590
1,477 1.1x
Kaufman County 1
200
2,196
2,926 0.09x

Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.

6 counties shown

What changed since June 4, 2026

2 projects in Dallas County moved between the two snapshots. Counts and MW are below; the projects themselves are for members.

Open the change feed
0
added to a queue, 0 MW
0
came online, started construction or signed an interconnection agreement, 0 MW
1
cancelled, dropped or went inactive, 153.4 MW
1
slipped its in-service date, 2.3 MW

Every change in Dallas County

Project, what changed, technology, MW and the dates that moved, for all 2 changes.

Members only
County: Dallas County, TXSince June 4, 2026 2 changes
ProjectChangeTechnologyMWPrevious dateNew date
2 changes behind this preview

Rows are hidden on public pages. Members see the project behind each change, its developer and the dates that moved.

Request access

Every record in Dallas County

Campus or project name, developer, status, MW, year and the developer’s contacts, for all 125 records. Filter, sort and export to Excel.

Members only
County: Dallas County, TXStatus: all except cancelledSort: MW, largest first 125 records
Project or campusDeveloperStatusMWYearContacts
125 records and 8.1 GW behind this preview

Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.

Request access

Get alerts for Dallas County

We email you when a data center or power project in Dallas County is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Open every campus, project and contact in Dallas County.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.