Denton County, Texas

Denton County, Texas has 909.5 MW of data centers on record, planned to operating, across 14 records, against 1.1 GW of generation operating inside the county. The queue adds 401 MW of planned generation across 2 projects. That is 0.9% of Texas's data center MW.

Data as of Grid region: ERCOTRefreshed monthly
909.5MW
data centers, planned to operating
14
data center records, not cancelled
0.9%
of Texas's data center MW
1.1GW
operating generation, 27 projects
401MW
planned generation, 2 projects
5
data center developers active here
Map

Denton County and its neighbors

Counties shaded by data center MW on record, planned to operating. 6 of its 6 neighboring counties have pages of their own. The rest are in the member database.

Wise no data centers Collin 629.5 MW Cooke no data centers Tarrant 1.4 GW Dallas 4 GW Denton 909.5 MW Grayson no data centers
no data center MWunder 100 MW100 to 1,000 MW1,000 to 5,000 MW5,000 to 15,000 MW15,000 MW or more no page yet

Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers

Headline finding
82%

of the generation operating in the county is matched by data center MW on record: 909.5 MW of data centers against 1.1 GW of plants, with 401 MW more planned.

Data centers, planned to operating909.5 MW
Operating generation1.1 GW
Planned generation401 MW

Data centers by status

14 records, 909.5 MW

Operating692.5 MW10 records, 76%
Under construction197 MW3 records, 22%
Planned20 MW1 record, 2%
Who owns each of the 14 records?Campus names, developers and contacts are for members.See what members get

The data center pipeline

13 records list a year online or expected, from 2000 to 2026. The largest expected additions are 259 MW listed for 2026. 1 record list no year.

Figure 1

Data center MW by year online or expected

Records not cancelled, by listed year. 2026 onward is planned or under construction.

Through 20252026 and later
0100200300400 Snapshot year 126 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 397 259 2026
View as table
YearRecordsMW
20001126
200100
200200
200300
200400
200500
200600
200700
200800
2009137
201000
201100
2012235
201300
201400
2015124
201600
201700
201800
201900
202000
202100
202200
202300
2024111
20253397
20264259
Source. FieldProspects database: ISO/RTO interconnection queues, EIA-860M and public data center filings, data as of October 8, 2026. 13 records with a year; 1 without are left out
Figure 2

Who is building in Denton

Data center developers by MW on record. Top 5 of 5.

Core Scientific 394 MW 6 sites
CoreWeave 262 MW 1 site
CyrusOne 196 MW 4 sites
Digital Realty 37.5 MW 2 sites
Qumulus AI 20 MW 1 site
View as table
DeveloperSitesMW
Core Scientific6394
CoreWeave1262
CyrusOne4196
Digital Realty238
Qumulus AI120
Members see all 5 developers, each campus they own here, and the people who run their site selection and energy procurement.
Aggregates only. Campus names are for members.

Power generation in the county

27 plants operate inside Denton County, 1.1 GW. The queue adds 401 MW across 2 projects.

Figure 3

Operating and planned generation by technology

MW in Denton County

OperatingPlanned
Battery StorageOperating 225 MW 2 projects
Battery StoragePlanned 401 MW 2 projects
SolarOperating 524.5 MW 4 projects
Natural GasOperating 353.3 MW 17 projects
Landfill GasOperating 3.2 MW 2 projects
HydroOperating 2.8 MW 1 project
OilOperating 1.3 MW 1 project
View as table
TechnologyStatusProjectsMW
Battery StorageOperating2225
Battery StoragePlanned2401
SolarOperating4524.5
Natural GasOperating17353.3
Landfill GasOperating23.2
HydroOperating12.8
OilOperating11.3
Operating: 1.1 GW. Planned: 401 MW. Even if every planned project is built, county generation would reach 1.5 GW against 909.5 MW of data centers.
Source: ISO queues and EIA-860M, via FieldProspects
Figure 4

Planned generation by listed in-service year

MW. Years before 2026 are past due.

Past dueDue 2026 or later
0100200300 201 2028 2029 200 2030
View as table
YearPlanned projectsMW
20281201
202900
20301200
No planned project is past its listed year

Denton County against its neighbors

Dallas County has the most data center MW among the neighbors, 4 GW, more than Denton County. 4 of the 6 have more generation operating than data center MW on record.

CountyData center recordsData center MWOperating generation MWPlanned generation MWData center MW per MW operating
Dallas County 68
4,041
2,070
2,025 2x
Tarrant County 29
1,432
1,484
792 0.97x
Denton County this page 14
910
1,110
401 0.82x
Collin County 20
630
590
1,477 1.1x
Wise County 0
0
2,237
4,377 0x
Grayson County 0
0
929
1,287 0x
Cooke County 0
0
638
948 0x

Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.

7 counties shown

Every record in Denton County

Campus or project name, developer, status, MW, year and the developer’s contacts, for all 43 records. Filter, sort and export to Excel.

Members only
County: Denton County, TXStatus: all except cancelledSort: MW, largest first 43 records
Project or campusDeveloperStatusMWYearContacts
43 records and 2.4 GW behind this preview

Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.

Request access

Get alerts for Denton County

We email you when a data center or power project in Denton County is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Open every campus, project and contact in Denton County.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.