FieldProspects

Blair County, Pennsylvania

Blair County, Pennsylvania has 6 power projects in the FieldProspects database: 5 operating plants totaling 252.1 MW and 1 planned project totaling 20 MW. No data center record lists the county. Wind leads with 250.6 MW across 4 projects. No planned project is past its listed in-service date.

Data as of Grid region: PJM InterconnectionRefreshed monthly
6
power projects, planned and operating
20MW
planned generation, 1 project
252.1MW
operating generation, 5 projects
0
planned projects past their listed in-service date
Map

Blair County and its neighbors

Counties shaded by data center MW on record, planned to operating. 4 of its 5 neighboring counties have pages of their own. The rest are in the member database.

Cambria no data centers Bedford Blair no data centers Centre no data centers Clearfield no data centers Huntingdon no data centers
no data center MWunder 100 MW100 to 1,000 MW1,000 to 5,000 MW5,000 to 15,000 MW15,000 MW or more no page yet

Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers

Headline finding
8%

of the county's operating generation is in the queue as new capacity: 20 MW planned across 1 project against 252.1 MW operating.

Operating generation252.1 MW
Planned generation20 MW

Technology mix

6 projects, 272.1 MW planned and operating

Wind250.6 MW4 projects, 92%
Solar20 MW1 project, 7%
Natural Gas1.5 MW1 project, 1%
Which companies own these 6 projects?Project names, developers and contacts are for members.See what members get

Power generation in the county

5 plants operate inside Blair County, 252.1 MW of wind and natural gas. The queue adds 20 MW across 1 project.

Figure 1

Operating and planned generation by technology

MW in Blair County

OperatingPlanned
WindOperating 250.6 MW 4 projects
SolarPlanned 20 MW 1 project
Natural GasOperating 1.5 MW 1 project
View as table
TechnologyStatusProjectsMW
WindOperating4250.6
SolarPlanned120
Natural GasOperating11.5
Operating: 252.1 MW. Planned: 20 MW. If every planned project is built, county generation would reach 272.1 MW.
Source. FieldProspects database: ISO/RTO interconnection queues, EIA-860M and public data center filings, data as of October 8, 2026.
Figure 2

Planned generation by listed in-service year

MW. Years before 2026 are past due.

Past dueDue 2026 or later
05101520 20 2027
View as table
YearPlanned projectsMW
2027120
No planned project is past its listed year

Blair County against its neighbors

None of the 4 neighboring counties with a page lists a data center record. Cambria County has the most operating generation among them, 1.8 GW.

CountyData center recordsData center MWOperating generation MWPlanned generation MWData center MW per MW operating
Cambria County 0
0
1,834
170 0x
Clearfield County 0
0
672
2,350 0x
Blair County this page 0
0
252
20 0x
Centre County 0
0
28
853 0x
Huntingdon County 0
0
25
20 0x

Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.

5 counties shown

What changed since June 4, 2026

2 projects in Blair County moved between the two snapshots. Counts and MW are below; the projects themselves are for members.

Open the change feed
0
added to a queue, 0 MW
1
came online, started construction or signed an interconnection agreement, 20 MW
1
cancelled, dropped or went inactive, 38 MW
0
slipped their in-service date, 0 MW

Every change in Blair County

Project, what changed, technology, MW and the dates that moved, for all 2 changes.

Members only
County: Blair County, PASince June 4, 2026 2 changes
ProjectChangeTechnologyMWPrevious dateNew date
2 changes behind this preview

Rows are hidden on public pages. Members see the project behind each change, its developer and the dates that moved.

Request access

Every record in Blair County

Project name, developer, status, MW, in-service year and the developer’s contacts, for all 6 records. Filter, sort and export to Excel.

Members only
County: Blair County, PAStatus: all except cancelledSort: MW, largest first 6 records
Project or campusDeveloperStatusMWYearContacts
6 records and 272.1 MW behind this preview

Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.

Request access

Get alerts for Blair County

We email you when a data center or power project in Blair County is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Open every campus, project and contact in Blair County.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.