Cuming County, Nebraska

Cuming County, Nebraska has 7 power projects in the FieldProspects database: 6 operating plants totaling 9.9 MW and 1 planned project totaling 1.5 MW. No data center record lists the county. Oil leads with 8.9 MW across 6 projects. No planned project is past its listed in-service date.

Data as of Grid region: Southwest Power Pool (SPP)Refreshed monthly
7
power projects, planned and operating
1.5MW
planned generation, 1 project
9.9MW
operating generation, 6 projects
0
planned projects past their listed in-service date
Map

Cuming County and its neighbors

Counties shaded by data center MW on record, planned to operating. 4 of its 6 neighboring counties have pages of their own. The rest are in the member database.

Cuming no data centers Stanton Wayne no data centers Colfax Dodge no data centers Thurston no data centers Burt no data centers
no data center MWunder 100 MW100 to 1,000 MW1,000 to 5,000 MW5,000 to 15,000 MW15,000 MW or more no page yet

Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers

Headline finding
15%

of the county's operating generation is in the queue as new capacity: 1.5 MW planned across 1 project against 9.9 MW operating.

Operating generation9.9 MW
Planned generation1.5 MW

Technology mix

7 projects, 11.4 MW planned and operating

Oil8.9 MW6 projects, 78%
Wind2.5 MW1 project, 22%
Which companies own these 7 projects?Project names, developers and contacts are for members.See what members get

Power generation in the county

6 plants operate inside Cuming County, 9.9 MW of oil and wind. The queue adds 1.5 MW across 1 project.

Figure 1

Operating and planned generation by technology

MW in Cuming County

OperatingPlanned
OilOperating 7.4 MW 5 projects
OilPlanned 1.5 MW 1 project
WindOperating 2.5 MW 1 project
View as table
TechnologyStatusProjectsMW
OilOperating57.4
OilPlanned11.5
WindOperating12.5
Operating: 9.9 MW. Planned: 1.5 MW. If every planned project is built, county generation would reach 11.4 MW.
Source. FieldProspects database: ISO/RTO interconnection queues, EIA-860M and public data center filings, data as of October 8, 2026.
Figure 2

Planned generation by listed in-service year

MW. Years before 2026 are past due.

Past dueDue 2026 or later
00.511.5 Snapshot year 2 2026
View as table
YearPlanned projectsMW
202611.5
No planned project is past its listed year

Cuming County against its neighbors

None of the 4 neighboring counties with a page lists a data center record. Wayne County has the most operating generation among them, 709.8 MW.

CountyData center recordsData center MWOperating generation MWPlanned generation MWData center MW per MW operating
Wayne County 0
0
710
250 0x
Dodge County 0
0
178
150 0x
Cuming County this page 0
0
10
2 0x
Thurston County 0
0
5
0 0x
Burt County 0
0
4
1,200 0x

Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.

5 counties shown

What changed since June 4, 2026

1 project in Cuming County moved between the two snapshots. Counts and MW are below; the projects themselves are for members.

Open the change feed
0
added to a queue, 0 MW
0
came online, started construction or signed an interconnection agreement, 0 MW
0
cancelled, dropped or went inactive, 0 MW
1
slipped its in-service date, 1.5 MW

Every change in Cuming County

Project, what changed, technology, MW and the dates that moved, for all 1 change.

Members only
County: Cuming County, NESince June 4, 2026 1 change
ProjectChangeTechnologyMWPrevious dateNew date
1 change behind this preview

Rows are hidden on public pages. Members see the project behind each change, its developer and the dates that moved.

Request access

Every record in Cuming County

Project name, developer, status, MW, in-service year and the developer’s contacts, for all 7 records. Filter, sort and export to Excel.

Members only
County: Cuming County, NEStatus: all except cancelledSort: MW, largest first 7 records
Project or campusDeveloperStatusMWYearContacts
7 records and 11.4 MW behind this preview

Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.

Request access

Get alerts for Cuming County

We email you when a data center or power project in Cuming County is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Open every campus, project and contact in Cuming County.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.