FieldProspects

Warren County, Iowa

Warren County, Iowa has 285 MW of data centers on record, planned to operating, across 5 records, against 44.3 MW of generation operating inside the county. Nothing is in the interconnection queue for the county. That is 3.8% of Iowa's data center MW.

Data as of Grid region: Midcontinent ISO (MISO)Refreshed monthly
285MW
data centers, planned to operating
5
data center records, not cancelled
3.8%
of Iowa's data center MW
44.3MW
operating generation, 3 projects
0MW
planned generation, 0 projects
1
data center developers active here
Map

Warren County and its neighbors

Counties shaded by data center MW on record, planned to operating. 3 of its 5 neighboring counties have pages of their own. The rest are in the member database.

Warren 285 MW Marion no data centers Polk 1.1 GW Madison 228 MW Lucas Clarke
no data center MWunder 100 MW100 to 1,000 MW1,000 to 5,000 MW5,000 to 15,000 MW15,000 MW or more no page yet

Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers

Headline finding
6.4times

more data center MW than operating generation in the county. Warren County's own plants cover 15.5% of the load on record, and nothing is in the queue.

Data centers, planned to operating285 MW
Operating generation44.3 MW
Planned generation0 MW

Data centers by status

5 records, 285 MW

Operating285 MW5 records, 100%
Who owns each of the 5 records?Campus names, developers and contacts are for members.See what members get

The data center pipeline

5 records list a year online or expected, from 2021 to 2025. No record lists a year at or after the snapshot.

Figure 1

Data center MW by year online or expected

Records not cancelled, by listed year. 2026 onward is planned or under construction.

Through 20252026 and later
050100150200 171 2021 2022 2023 57 2024 57 2025
View as table
YearRecordsMW
20213171
202200
202300
2024157
2025157
Source. FieldProspects database: ISO/RTO interconnection queues, EIA-860M and public data center filings, data as of October 8, 2026. 5 records with a year
Figure 2

Who is building in Warren

Data center developers by MW on record. Top 1 of 1.

Microsoft 285 MW 5 sites
View as table
DeveloperSitesMW
Microsoft5285
Members see all 1 developer, each campus they own here, and the people who run their site selection and energy procurement.
Aggregates only. Campus names are for members.

Power generation in the county

3 plants operate inside Warren County, 44.3 MW of oil and solar. Nothing is in the queue for the county.

Figure 3

Operating and planned generation by technology

MW in Warren County

OperatingPlanned
OilOperating 40.9 MW 2 projects
SolarOperating 3.4 MW 1 project
View as table
TechnologyStatusProjectsMW
OilOperating240.9
SolarOperating13.4
Operating: 44.3 MW. Planned: 0 MW. Even if every planned project is built, county generation would reach 44.3 MW against 285 MW of data centers.
Source: ISO queues and EIA-860M, via FieldProspects

Warren County against its neighbors

Polk County has the most data center MW among the neighbors, 1.1 GW, more than Warren County. 1 of the 3 have more generation operating than data center MW on record.

CountyData center recordsData center MWOperating generation MWPlanned generation MWData center MW per MW operating
Polk County 27
1,074
1,066
340 1x
Warren County this page 5
285
44
0 6.4x
Madison County 4
228
137
0 1.7x
Marion County 0
0
100
0 0x

Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.

4 counties shown

Every record in Warren County

Campus or project name, developer, status, MW, year and the developer’s contacts, for all 8 records. Filter, sort and export to Excel.

Members only
County: Warren County, IAStatus: all except cancelledSort: MW, largest first 8 records
Project or campusDeveloperStatusMWYearContacts
8 records and 329.3 MW behind this preview

Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.

Request access

Get alerts for Warren County

We email you when a data center or power project in Warren County is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Open every campus, project and contact in Warren County.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.