FieldProspects

Polk County, Iowa

Polk County, Iowa has 1.1 GW of data centers on record, planned to operating, across 27 records, against 1.1 GW of generation operating inside the county. The queue adds 340 MW of planned generation across 2 projects. That is 14.1% of Iowa's data center MW.

Data as of Grid region: Midcontinent ISO (MISO)Refreshed monthly
1.1GW
data centers, planned to operating
27
data center records, not cancelled
14.1%
of Iowa's data center MW
1.1GW
operating generation, 31 projects
340MW
planned generation, 2 projects
5
data center developers active here
Map

Polk County and its neighbors

Counties shaded by data center MW on record, planned to operating. 4 of its 6 neighboring counties have pages of their own. The rest are in the member database.

Warren 285 MW Boone no data centers Marion no data centers Polk 1.1 GW Jasper Story 1 GW Dallas
no data center MWunder 100 MW100 to 1,000 MW1,000 to 5,000 MW5,000 to 15,000 MW15,000 MW or more no page yet

Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers

Headline finding
1times

more data center MW than operating generation in the county. Polk County's own plants cover 99.2% of the load on record, and the planned pipeline adds 340 MW.

Data centers, planned to operating1.1 GW
Operating generation1.1 GW
Planned generation340 MW

Data centers by status

27 records, 1.1 GW

Operating911 MW25 records, 85%
Planned163 MW2 records, 15%
Who owns each of the 27 records?Campus names, developers and contacts are for members.See what members get

The data center pipeline

26 records list a year online or expected, from 2014 to 2027. The largest expected additions are 97 MW listed for 2026 and 13 MW for 2027. 1 record list no year.

Figure 1

Data center MW by year online or expected

Records not cancelled, by listed year. 2026 onward is planned or under construction.

Through 20252026 and later
050100150200 Snapshot year 2014 2015 2016 2017 2018 2019 131 2020 2021 2022 153 2023 2024 97 2025 97 2026 2027
View as table
YearRecordsMW
2014142
2015136
2016235
2017383
2018235
2019296
20204131
202100
2022148
20233153
2024258
2025297
2026297
2027113
Source. FieldProspects database: ISO/RTO interconnection queues, EIA-860M and public data center filings, data as of October 8, 2026. 26 records with a year; 1 without are left out
Figure 2

Who is building in Polk

Data center developers by MW on record. Top 5 of 5.

Meta 542 MW 12 sites
Microsoft 368 MW 12 sites
Cielo Digital Infrastructure 150 MW 1 site
Edged 13 MW 1 site
Cologix 1 MW 1 site
View as table
DeveloperSitesMW
Meta12542
Microsoft12368
Cielo Digital Infrastructure1150
Edged113
Cologix11
Members see all 5 developers, each campus they own here, and the people who run their site selection and energy procurement.
Aggregates only. Campus names are for members.

Power generation in the county

31 plants operate inside Polk County, 1.1 GW. The queue adds 340 MW across 2 projects.

Figure 3

Operating and planned generation by technology

MW in Polk County

OperatingPlanned
Natural GasOperating 1 GW 17 projects
Battery StoragePlanned 340 MW 2 projects
Landfill GasOperating 11.2 MW 11 projects
BiomassOperating 2.8 MW 2 projects
OilOperating 2 MW 1 project
View as table
TechnologyStatusProjectsMW
Natural GasOperating171,049.6
Battery StoragePlanned2340
Landfill GasOperating1111.2
BiomassOperating22.8
OilOperating12
Operating: 1.1 GW. Planned: 340 MW. Even if every planned project is built, county generation would reach 1.4 GW against 1.1 GW of data centers.
Source: ISO queues and EIA-860M, via FieldProspects
Figure 4

Planned generation by listed in-service year

MW. Years before 2026 are past due.

Past dueDue 2026 or later
050100150200 Snapshot year 170 2026 170 2027
View as table
YearPlanned projectsMW
20261170
20271170
No planned project is past its listed year

Polk County against its neighbors

Story County has the most data center MW among the neighbors, 1 GW, 93% of Polk County's. 2 of the 4 have more generation operating than data center MW on record.

CountyData center recordsData center MWOperating generation MWPlanned generation MWData center MW per MW operating
Polk County this page 27
1,074
1,066
340 1x
Story County 1
1,000
431
400 2.3x
Warren County 5
285
44
0 6.4x
Boone County 0
0
348
225 0x
Marion County 0
0
100
0 0x

Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.

5 counties shown

Every record in Polk County

Campus or project name, developer, status, MW, year and the developer’s contacts, for all 60 records. Filter, sort and export to Excel.

Members only
County: Polk County, IAStatus: all except cancelledSort: MW, largest first 60 records
Project or campusDeveloperStatusMWYearContacts
60 records and 2.5 GW behind this preview

Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.

Request access

Get alerts for Polk County

We email you when a data center or power project in Polk County is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Open every campus, project and contact in Polk County.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.