FieldProspects

Black Hawk County, Iowa

Black Hawk County, Iowa has 1 MW of data centers on record, planned to operating, across 1 record, against 394.4 MW of generation operating inside the county. Nothing is in the interconnection queue for the county. That is 0% of Iowa's data center MW.

Data as of Grid region: Midcontinent ISO (MISO)Refreshed monthly
1MW
data centers, planned to operating
1
data center records, not cancelled
0%
of Iowa's data center MW
394.4MW
operating generation, 22 projects
0MW
planned generation, 0 projects
1
data center developers active here
Map

Black Hawk County and its neighbors

Counties shaded by data center MW on record, planned to operating. 4 of its 6 neighboring counties have pages of their own. The rest are in the member database.

Black Hawk 1 MW Buchanan Bremer no data centers Grundy no data centers Benton no data centers Butler Tama no data centers
no data center MWunder 100 MW100 to 1,000 MW1,000 to 5,000 MW5,000 to 15,000 MW15,000 MW or more no page yet

Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers

Headline finding
0%

of the generation operating in the county is matched by data center MW on record: 1 MW of data centers against 394.4 MW of plants.

Data centers, planned to operating1 MW
Operating generation394.4 MW
Planned generation0 MW

Data centers by status

1 record, 1 MW

Operating1 MW1 record, 100%
Who owns each of the 1 records?Campus names, developers and contacts are for members.See what members get

The data center pipeline

1 record list a year online or expected, from 2004 to 2004. No record lists a year at or after the snapshot.

Figure 1

Data center MW by year online or expected

Records not cancelled, by listed year. 2026 onward is planned or under construction.

Through 20252026 and later
00.250.50.751 1 2004
View as table
YearRecordsMW
200411
Source. FieldProspects database: ISO/RTO interconnection queues, EIA-860M and public data center filings, data as of October 8, 2026. 1 record with a year
Figure 2

Who is building in Black Hawk

Data center developers by MW on record. Top 1 of 1.

Cologix 1 MW 1 site
View as table
DeveloperSitesMW
Cologix11
Members see all 1 developer, each campus they own here, and the people who run their site selection and energy procurement.
Aggregates only. Campus names are for members.

Power generation in the county

22 plants operate inside Black Hawk County, 394.4 MW. Nothing is in the queue for the county.

Figure 3

Operating and planned generation by technology

MW in Black Hawk County

OperatingPlanned
Natural GasOperating 366.5 MW 8 projects
OilOperating 23.4 MW 12 projects
SolarOperating 4.5 MW 2 projects
View as table
TechnologyStatusProjectsMW
Natural GasOperating8366.5
OilOperating1223.4
SolarOperating24.5
Operating: 394.4 MW. Planned: 0 MW. Even if every planned project is built, county generation would reach 394.4 MW against 1 MW of data centers.
Source: ISO queues and EIA-860M, via FieldProspects

Black Hawk County against its neighbors

None of the 4 neighboring counties with a page lists a data center record. Grundy County has the most operating generation among them, 242.5 MW.

CountyData center recordsData center MWOperating generation MWPlanned generation MWData center MW per MW operating
Black Hawk County this page 1
1
394
0 0x
Grundy County 0
0
243
0 0x
Tama County 0
0
180
269 0x
Bremer County 0
0
84
0 0x
Benton County 0
0
18
0 0x

Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.

5 counties shown

Every record in Black Hawk County

Campus or project name, developer, status, MW, year and the developer’s contacts, for all 23 records. Filter, sort and export to Excel.

Members only
County: Black Hawk County, IAStatus: all except cancelledSort: MW, largest first 23 records
Project or campusDeveloperStatusMWYearContacts
23 records and 395.4 MW behind this preview

Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.

Request access

Get alerts for Black Hawk County

We email you when a data center or power project in Black Hawk County is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Open every campus, project and contact in Black Hawk County.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.