Santa Clara County, California has 1.9 GW of data centers on record, planned to operating, across 51 records, against 1.9 GW of generation operating inside the county. The queue adds 1.2 GW of planned generation across 9 projects, 4 of them past their listed in-service date.

Data as of Grid region: California ISO (CAISO)Refreshed monthly
1.9GW
data centers, planned to operating
51
data center records, not cancelled
62.3%
of California's data center MW
1.9GW
operating generation, 172 projects
1.2GW
planned generation, 9 projects
22
data center developers active here
Map

Santa Clara County and its neighbors

Counties shaded by data center MW on record, planned to operating. 6 of its 6 neighboring counties have pages of their own. The rest are in the member database.

San Benito no data centers Stanislaus no data centers Merced no data centers Santa Clara 1.9 GW San Mateo 0 MW Alameda 125.6 MW Santa Cruz no data centers
no data center MWunder 100 MW100 to 1,000 MW1,000 to 5,000 MW5,000 to 15,000 MW15,000 MW or more no page yet

Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers

Headline finding
100%

of the generation operating in the county is matched by data center MW on record: 1.9 GW of data centers against 1.9 GW of plants, with 1.2 GW more planned.

Data centers, planned to operating1.9 GW
Operating generation1.9 GW
Planned generation1.2 GW

Data centers by status

51 records, 1.9 GW

Operating669.7 MW31 records, 36%
Under construction98 MW2 records, 5%
Planned1.1 GW18 records, 59%
Who owns each of the 51 records?Campus names, developers and contacts are for members.See what members get

The data center pipeline

30 records list a year online or expected, from 2005 to 2030. The largest expected additions are 159.4 MW listed for 2028 and 98 MW for 2027. 21 records list no year.

Figure 1

Data center MW by year online or expected

Records not cancelled, by listed year. 2026 onward is planned or under construction.

Through 20252026 and later
050100150200 Snapshot year 2005 2007 2009 2011 2013 2015 2017 2019 2021 2023 117 2025 78 98 2027 159 2029
View as table
YearRecordsMW
2005120
200630
2007227
200800
200900
201000
2011239
201200
2013217
201400
2015123
201617
201700
2018124
2019134
2020129
2021373
2022135
2023139
202419
20252117
2026278
2027298
20282159
202900
2030142
Source. FieldProspects database: ISO/RTO interconnection queues, EIA-860M and public data center filings, data as of October 8, 2026. 30 records with a year; 21 without are left out
Figure 2

Who is building in Santa Clara

Data center developers by MW on record. Top 6 of 22.

Prologis 495 MW 5 sites
Vantage Data Centers 280.8 MW 10 sites
Microsoft 197 MW 2 sites
Stack Infrastructure 193.7 MW 5 sites
Amazon 176 MW 4 sites
Terra Ventures 99 MW 1 site
View as table
DeveloperSitesMW
Prologis5495
Vantage Data Centers10281
Microsoft2197
Stack Infrastructure5194
Amazon4176
Terra Ventures199
Members see all 22 developers, each campus they own here, and the people who run their site selection and energy procurement.
Aggregates only. Campus names are for members.

Power generation in the county

172 plants operate inside Santa Clara County, 1.9 GW. The queue adds 1.2 GW across 9 projects, and 4 of them are past their listed in-service date.

Figure 3

Operating and planned generation by technology

MW in Santa Clara County

OperatingPlanned
Natural GasOperating 1.5 GW 56 projects
Natural GasPlanned 120 MW 1 project
Battery StorageOperating 77 MW 4 projects
Battery StoragePlanned 1.1 GW 8 projects
OilOperating 232.1 MW 95 projects
SolarOperating 36.1 MW 12 projects
Landfill GasOperating 4 MW 1 project
BiomassOperating 3.2 MW 4 projects
View as table
TechnologyStatusProjectsMW
Natural GasOperating561,534.7
Natural GasPlanned1120
Battery StorageOperating477
Battery StoragePlanned81,070.4
OilOperating95232.1
SolarOperating1236.1
Landfill GasOperating14
BiomassOperating43.2
Operating: 1.9 GW. Planned: 1.2 GW. Even if every planned project is built, county generation would reach 3.1 GW against 1.9 GW of data centers.
Source: ISO queues and EIA-860M, via FieldProspects
Figure 4

Planned generation by listed in-service year

MW. Years before 2026 are past due.

Past dueDue 2026 or later
0200400600800 Snapshot year 123 2023 2024 53 2025 50 2026 200 2027 2028 663 2029 102 2030
View as table
YearPlanned projectsMW
20232123
202400
2025253
2026150
20271200
202800
20292662.5
20301101.9
4 projects, 176 MW, were due before 2026

Santa Clara County against its neighbors

Alameda County has the most data center MW among the neighbors, 125.6 MW, 7% of Santa Clara County's. 6 of the 6 have more generation operating than data center MW on record.

CountyData center recordsData center MWOperating generation MWPlanned generation MWData center MW per MW operating
Santa Clara County this page 51
1,886
1,887
1,190 1x
Alameda County 3
126
1,348
2,291 0.09x
Stanislaus County 0
0
1,505
1,443 0x
Merced County 0
0
850
6,993 0x
San Benito County 0
0
148
225 0x
San Mateo County 1
0
29
253 0x
Santa Cruz County 0
0
14
204 0x

Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.

7 counties shown

What changed since June 4, 2026

8 projects in Santa Clara County moved between the two snapshots. Counts and MW are below; the projects themselves are for members.

Open the change feed
0
added to a queue, 0 MW
1
came online, started construction or signed an interconnection agreement, 75 MW
6
cancelled, dropped or went inactive, 800.8 MW
1
slipped its in-service date, 50 MW

Every change in Santa Clara County

Project, what changed, technology, MW and the dates that moved, for all 8 changes.

Members only
County: Santa Clara County, CASince June 4, 2026 8 changes
ProjectChangeTechnologyMWPrevious dateNew date
8 changes behind this preview

Rows are hidden on public pages. Members see the project behind each change, its developer and the dates that moved.

Request access

Every record in Santa Clara County

Campus or project name, developer, status, MW, year and the developer’s contacts, for all 232 records. Filter, sort and export to Excel.

Members only
County: Santa Clara County, CAStatus: all except cancelledSort: MW, largest first 232 records
Project or campusDeveloperStatusMWYearContacts
232 records and 5 GW behind this preview

Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.

Request access

Get alerts for Santa Clara County

We email you when a data center or power project in Santa Clara County is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Open every campus, project and contact in Santa Clara County.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.