Red River County, Texas

Red River County, Texas has 6 power projects in the FieldProspects database: 2 operating plants totaling 610 MW and 4 planned projects totaling 330.2 MW. No data center record lists the county. Solar leads with 811 MW across 4 projects.

Data as of Grid region: ERCOTRefreshed monthly
6
power projects, planned and operating
330.2MW
planned generation, 4 projects
610MW
operating generation, 2 solar projects
0
planned projects past their listed in-service date
Map

Red River County and its neighbors

Counties shaded by data center MW on record, planned to operating. 6 of its 6 neighboring counties have pages of their own. The rest are in the member database.

Franklin no data centers Bowie no data centers Morris no data centers Delta no data centers Red River no data centers Lamar 75 MW Titus no data centers
no data center MWunder 100 MW100 to 1,000 MW1,000 to 5,000 MW5,000 to 15,000 MW15,000 MW or more no page yet

Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers

Headline finding
54%

of the county's operating generation is in the queue as new capacity: 330.2 MW planned across 4 projects against 610 MW operating.

Operating generation610 MW
Planned generation330.2 MW

Technology mix

6 projects, 940.2 MW planned and operating

Solar811 MW4 projects, 86%
Battery Storage129.2 MW2 projects, 14%
Which companies own these 6 projects?Project names, developers and contacts are for members.See what members get

Power generation in the county

2 plants operate inside Red River County, 610 MW of solar. The queue adds 330.2 MW across 4 projects.

Figure 1

Operating and planned generation by technology

MW in Red River County

OperatingPlanned
SolarOperating 610 MW 2 projects
SolarPlanned 201 MW 2 projects
Battery StoragePlanned 129.2 MW 2 projects
View as table
TechnologyStatusProjectsMW
SolarOperating2610
SolarPlanned2201
Battery StoragePlanned2129.2
Operating: 610 MW. Planned: 330.2 MW. If every planned project is built, county generation would reach 940.2 MW.
Source. FieldProspects database: ISO/RTO interconnection queues, EIA-860M and public data center filings, data as of October 8, 2026.
Figure 2

Planned generation by listed in-service year

MW. Years before 2026 are past due.

Past dueDue 2026 or later
0100200300400 330 2028
View as table
YearPlanned projectsMW
20284330.2
No planned project is past its listed year

Red River County against its neighbors

Lamar County has the most data center MW among the neighbors, 75 MW. 4 of the 6 have more generation operating than data center MW on record.

CountyData center recordsData center MWOperating generation MWPlanned generation MWData center MW per MW operating
Lamar County 1
75
2,838
7,671 0.03x
Titus County 0
0
1,116
200 0x
Red River County this page 0
0
610
330 0x
Delta County 0
0
305
353 0x
Franklin County 0
0
258
3,133 0x
Bowie County 0
0
0
750 no operating MW
Morris County 0
0
0
2,281 no operating MW

Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.

7 counties shown

Every record in Red River County

Project name, developer, status, MW, in-service year and the developer’s contacts, for all 6 records. Filter, sort and export to Excel.

Members only
County: Red River County, TXStatus: all except cancelledSort: MW, largest first 6 records
Project or campusDeveloperStatusMWYearContacts
6 records and 940.2 MW behind this preview

Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.

Request access

Get alerts for Red River County

We email you when a data center or power project in Red River County is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Open every campus, project and contact in Red River County.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.