Real County, Texas has 3 power projects in the FieldProspects database: 1 operating plant totaling 1.5 MW and 2 planned projects totaling 19.8 MW. No data center record lists the county. Battery Storage leads with 19.8 MW across 2 projects.

Data as of Grid region: ERCOTRefreshed monthly
3
power projects, planned and operating
19.8MW
planned generation, 2 projects
1.5MW
operating generation, 1 solar project
0
planned projects past their listed in-service date
Map

Real County and its neighbors

Counties shaded by data center MW on record, planned to operating. 2 of its 4 neighboring counties have pages of their own. The rest are in the member database.

Uvalde no data centers Kerr Real no data centers Edwards Bandera no data centers
no data center MWunder 100 MW100 to 1,000 MW1,000 to 5,000 MW5,000 to 15,000 MW15,000 MW or more no page yet

Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers

Headline finding
13.2times

more planned than operating generation in Real County. 2 projects in the queue would add 19.8 MW to the 1.5 MW operating today.

Operating generation1.5 MW
Planned generation19.8 MW

Technology mix

3 projects, 21.3 MW planned and operating

Battery Storage19.8 MW2 projects, 93%
Solar1.5 MW1 project, 7%
Which companies own these 3 projects?Project names, developers and contacts are for members.See what members get

Power generation in the county

1 plant operate inside Real County, 1.5 MW of solar. The queue adds 19.8 MW across 2 projects.

Figure 1

Operating and planned generation by technology

MW in Real County

OperatingPlanned
Battery StoragePlanned 19.8 MW 2 projects
SolarOperating 1.5 MW 1 project
View as table
TechnologyStatusProjectsMW
Battery StoragePlanned219.8
SolarOperating11.5
Operating: 1.5 MW. Planned: 19.8 MW. If every planned project is built, county generation would reach 21.3 MW.
Source. FieldProspects database: ISO/RTO interconnection queues, EIA-860M and public data center filings, data as of October 8, 2026.
Figure 2

Planned generation by listed in-service year

MW. Years before 2026 are past due.

Past dueDue 2026 or later
05101520 Snapshot year 20 2026
View as table
YearPlanned projectsMW
2026219.8
No planned project is past its listed year

Real County against its neighbors

None of the 2 neighboring counties with a page lists a data center record. Uvalde County has the most operating generation among them, 303.5 MW.

CountyData center recordsData center MWOperating generation MWPlanned generation MWData center MW per MW operating
Uvalde County 0
0
304
1,578 0x
Bandera County 0
0
20
469 0x
Real County this page 0
0
2
20 0x

Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.

3 counties shown

What changed since June 4, 2026

1 project in Real County moved between the two snapshots. Counts and MW are below; the projects themselves are for members.

Open the change feed
0
added to a queue, 0 MW
0
came online, started construction or signed an interconnection agreement, 0 MW
0
cancelled, dropped or went inactive, 0 MW
1
slipped its in-service date, 9.9 MW

Every change in Real County

Project, what changed, technology, MW and the dates that moved, for all 1 change.

Members only
County: Real County, TXSince June 4, 2026 1 change
ProjectChangeTechnologyMWPrevious dateNew date
1 change behind this preview

Rows are hidden on public pages. Members see the project behind each change, its developer and the dates that moved.

Request access

Every record in Real County

Project name, developer, status, MW, in-service year and the developer’s contacts, for all 3 records. Filter, sort and export to Excel.

Members only
County: Real County, TXStatus: all except cancelledSort: MW, largest first 3 records
Project or campusDeveloperStatusMWYearContacts
3 records and 21.3 MW behind this preview

Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.

Request access

Get alerts for Real County

We email you when a data center or power project in Real County is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Open every campus, project and contact in Real County.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.