FieldProspects

Crawford County, Pennsylvania

Crawford County, Pennsylvania has 8 power projects in the FieldProspects database, all of them planned, 417.8 MW in total, with no operating plant on record in the county. No data center record lists the county. Solar leads with 417.8 MW across 8 projects.

Data as of Grid region: PJM InterconnectionRefreshed monthly
8
power projects, planned and operating
417.8MW
planned generation, 8 projects
0MW
operating generation, no plants on record
2
planned projects past their listed in-service date
Map

Crawford County and its neighbors

Counties shaded by data center MW on record, planned to operating. 4 of its 4 neighboring counties have pages of their own. The rest are in the member database.

Venango no data centers Erie no data centers Mercer no data centers Crawford no data centers Warren no data centers
no data center MWunder 100 MW100 to 1,000 MW1,000 to 5,000 MW5,000 to 15,000 MW15,000 MW or more no page yet

Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers

Headline finding
417.8MW

of planned generation across 8 projects, with no operating plant on record inside Crawford County. 2 projects are past their listed in-service date.

Operating generation0 MW
Planned generation417.8 MW

Technology mix

8 projects, 417.8 MW planned and operating

Solar417.8 MW8 projects, 100%
Which companies own these 8 projects?Project names, developers and contacts are for members.See what members get

Power generation in the county

No operating plant is on record inside Crawford County. The queue adds 417.8 MW across 8 projects, and 2 of them are past their listed in-service date.

Figure 1

Operating and planned generation by technology

MW in Crawford County

OperatingPlanned
SolarPlanned 417.8 MW 8 projects
View as table
TechnologyStatusProjectsMW
SolarPlanned8417.8
Operating: 0 MW. Planned: 417.8 MW. If every planned project is built, county generation would reach 417.8 MW.
Source. FieldProspects database: ISO/RTO interconnection queues, EIA-860M and public data center filings, data as of October 8, 2026.
Figure 2

Planned generation by listed in-service year

MW. Years before 2026 are past due. 1 planned project lists no date and is left out.

Past dueDue 2026 or later
050100150200 Snapshot year 170 2024 2025 58 2026 40 2027
View as table
YearPlanned projectsMW
20242170
202500
2026357.8
2027240
2 projects, 170 MW, were due before 2026

Crawford County against its neighbors

None of the 4 neighboring counties with a page lists a data center record. Warren County has the most operating generation among them, 491 MW.

CountyData center recordsData center MWOperating generation MWPlanned generation MWData center MW per MW operating
Warren County 0
0
491
37 0x
Venango County 0
0
409
260 0x
Erie County 0
0
41
260 0x
Mercer County 0
0
4
275 0x
Crawford County this page 0
0
0
418 no operating MW

Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.

5 counties shown

What changed since June 4, 2026

10 projects in Crawford County moved between the two snapshots. Counts and MW are below; the projects themselves are for members.

Open the change feed
0
added to a queue, 0 MW
2
came online, started construction or signed an interconnection agreement, 40 MW
6
cancelled, dropped or went inactive, 224.8 MW
2
slipped their in-service date, 40 MW

Every change in Crawford County

Project, what changed, technology, MW and the dates that moved, for all 10 changes.

Members only
County: Crawford County, PASince June 4, 2026 10 changes
ProjectChangeTechnologyMWPrevious dateNew date
10 changes behind this preview

Rows are hidden on public pages. Members see the project behind each change, its developer and the dates that moved.

Request access

Every record in Crawford County

Project name, developer, status, MW, in-service year and the developer’s contacts, for all 8 records. Filter, sort and export to Excel.

Members only
County: Crawford County, PAStatus: all except cancelledSort: MW, largest first 8 records
Project or campusDeveloperStatusMWYearContacts
8 records and 417.8 MW behind this preview

Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.

Request access

Get alerts for Crawford County

We email you when a data center or power project in Crawford County is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Open every campus, project and contact in Crawford County.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.