Beaver County, Pennsylvania
Beaver County, Pennsylvania has 1.3 GW of data centers on record, planned to operating, across 5 records, against 2.2 GW of generation operating inside the county. The queue adds 320.4 MW of planned generation across 5 projects, 1 of them past its listed in-service date.
Beaver County and its neighbors
Counties shaded by data center MW on record, planned to operating. 3 of its 4 neighboring counties have pages of their own. The rest are in the member database.
Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers
of the generation operating in the county is matched by data center MW on record: 1.3 GW of data centers against 2.2 GW of plants, with 320.4 MW more planned.
Data centers by status
5 records, 1.3 GW
The data center pipeline
None of the 5 records lists a year online or expected, so the pipeline is shown by developer only.
Who is building in Beaver
Data center developers by MW on record. Top 2 of 2.
View as table
| Developer | Sites | MW |
|---|---|---|
| Aligned | 3 | 765 |
| Fezzik Energy | 1 | 496 |
Power generation in the county
16 plants operate inside Beaver County, 2.2 GW. The queue adds 320.4 MW across 5 projects, and one of them is past its listed in-service date.
Operating and planned generation by technology
MW in Beaver County
View as table
| Technology | Status | Projects | MW |
|---|---|---|---|
| Nuclear | Operating | 2 | 1,846.8 |
| Natural Gas | Operating | 5 | 309.8 |
| Battery Storage | Planned | 2 | 300 |
| Solar | Operating | 4 | 55.5 |
| Hydro | Operating | 5 | 6.4 |
| Hydro | Planned | 3 | 20.4 |
Planned generation by listed in-service year
MW. Years before 2026 are past due. 1 planned project lists no date and is left out.
View as table
| Year | Planned projects | MW |
|---|---|---|
| 2023 | 1 | 150 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 | 0 | 0 |
| 2027 | 0 | 0 |
| 2028 | 3 | 20.4 |
Beaver County against its neighbors
Washington County has the most data center MW among the neighbors, 500 MW, 40% of Beaver County's. 2 of the 3 have more generation operating than data center MW on record.
| County | Data center records | Data center MW | Operating generation MW | Planned generation MW | Data center MW per MW operating |
|---|---|---|---|---|---|
| Beaver County this page | 5 | 320 | 0.57x | ||
| Washington County | 1 | 412 | 104x | ||
| Allegheny County | 6 | 87 | 0.19x | ||
| Lawrence County | 0 | 562 | 0x |
Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.
4 counties shownWhat changed since June 4, 2026
3 projects in Beaver County moved between the two snapshots. Counts and MW are below; the projects themselves are for members.
Every change in Beaver County
Project, what changed, technology, MW and the dates that moved, for all 3 changes.
| Project | Change | Technology | MW | Previous date | New date |
|---|---|---|---|---|---|
Rows are hidden on public pages. Members see the project behind each change, its developer and the dates that moved.
Every record in Beaver County
Campus or project name, developer, status, MW, year and the developer’s contacts, for all 26 records. Filter, sort and export to Excel.
| Project or campus | Developer | Status | MW | Year | Contacts |
|---|---|---|---|---|---|
Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.
Get alerts for Beaver County
We email you when a data center or power project in Beaver County is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.
Open every campus, project and contact in Beaver County.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.