Pasquotank County, North Carolina has 5 power projects in the FieldProspects database: 3 operating plants totaling 43.1 MW and 2 planned projects totaling 12.3 MW. No data center record lists the county. Solar leads with 51.5 MW across 4 projects.

Data as of Grid region: PJM InterconnectionRefreshed monthly
5
power projects, planned and operating
12.3MW
planned generation, 2 projects
43.1MW
operating generation, 3 solar projects
0
planned projects past their listed in-service date
Map

Pasquotank County and its neighbors

Counties shaded by data center MW on record, planned to operating. 3 of its 3 neighboring counties have pages of their own. The rest are in the member database.

Perquimans no data centers Gates no data centers Pasquotank no data centers Camden no data centers
no data center MWunder 100 MW100 to 1,000 MW1,000 to 5,000 MW5,000 to 15,000 MW15,000 MW or more no page yet

Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers

Headline finding
29%

of the county's operating generation is in the queue as new capacity: 12.3 MW planned across 2 projects against 43.1 MW operating.

Operating generation43.1 MW
Planned generation12.3 MW

Technology mix

5 projects, 55.4 MW planned and operating

Solar51.5 MW4 projects, 93%
Battery Storage3.9 MW1 project, 7%
Which companies own these 5 projects?Project names, developers and contacts are for members.See what members get

Power generation in the county

3 plants operate inside Pasquotank County, 43.1 MW of solar. The queue adds 12.3 MW across 2 projects.

Figure 1

Operating and planned generation by technology

MW in Pasquotank County

OperatingPlanned
SolarOperating 43.1 MW 3 projects
SolarPlanned 8.4 MW 1 project
Battery StoragePlanned 3.9 MW 1 project
View as table
TechnologyStatusProjectsMW
SolarOperating343.1
SolarPlanned18.4
Battery StoragePlanned13.9
Operating: 43.1 MW. Planned: 12.3 MW. If every planned project is built, county generation would reach 55.4 MW.
Source. FieldProspects database: ISO/RTO interconnection queues, EIA-860M and public data center filings, data as of October 8, 2026.
Figure 2

Planned generation by listed in-service year

MW. Years before 2026 are past due.

Past dueDue 2026 or later
051015 Snapshot year 12 2026
View as table
YearPlanned projectsMW
2026212.3
No planned project is past its listed year

Pasquotank County against its neighbors

None of the 3 neighboring counties with a page lists a data center record. Perquimans County has the most operating generation among them, 259.2 MW.

CountyData center recordsData center MWOperating generation MWPlanned generation MWData center MW per MW operating
Perquimans County 0
0
259
0 0x
Pasquotank County this page 0
0
43
12 0x
Camden County 0
0
35
0 0x
Gates County 0
0
15
0 0x

Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.

4 counties shown

What changed since June 4, 2026

4 projects in Pasquotank County moved between the two snapshots. Counts and MW are below; the projects themselves are for members.

Open the change feed
1
added to a queue, 8.4 MW
2
came online, started construction or signed an interconnection agreement, 7.8 MW
1
cancelled, dropped or went inactive, 20 MW
0
slipped their in-service date, 0 MW

Every change in Pasquotank County

Project, what changed, technology, MW and the dates that moved, for all 4 changes.

Members only
County: Pasquotank County, NCSince June 4, 2026 4 changes
ProjectChangeTechnologyMWPrevious dateNew date
4 changes behind this preview

Rows are hidden on public pages. Members see the project behind each change, its developer and the dates that moved.

Request access

Every record in Pasquotank County

Project name, developer, status, MW, in-service year and the developer’s contacts, for all 5 records. Filter, sort and export to Excel.

Members only
County: Pasquotank County, NCStatus: all except cancelledSort: MW, largest first 5 records
Project or campusDeveloperStatusMWYearContacts
5 records and 55.4 MW behind this preview

Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.

Request access

Get alerts for Pasquotank County

We email you when a data center or power project in Pasquotank County is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Open every campus, project and contact in Pasquotank County.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.