Hunterdon County, New Jersey has 0 MW of data centers on record, planned to operating, across 1 record, against 614.3 MW of generation operating inside the county. The queue adds 39.8 MW of planned generation across 2 projects, 1 of them past its listed in-service date.

Data as of Grid region: PJM InterconnectionRefreshed monthly
0MW
data centers, planned to operating
1
data center records, not cancelled
0%
of New Jersey's data center MW
614.3MW
operating generation, 22 projects
39.8MW
planned generation, 2 projects
1
data center developers active here
Map

Hunterdon County and its neighbors

Counties shaded by data center MW on record, planned to operating. 4 of its 4 neighboring counties have pages of their own. The rest are in the member database.

Hunterdon 0 MW Warren no data centers Somerset no data centers Mercer 119 MW Morris 5 MW
no data center MWunder 100 MW100 to 1,000 MW1,000 to 5,000 MW5,000 to 15,000 MW15,000 MW or more no page yet

Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers

Headline finding
0%

of the generation operating in the county is matched by data center MW on record: 0 MW of data centers against 614.3 MW of plants, with 39.8 MW more planned.

Data centers, planned to operating0 MW
Operating generation614.3 MW
Planned generation39.8 MW

Data centers by status

1 record, 0 MW

Planned0 MW1 record, 0%
Who owns each of the 1 records?Campus names, developers and contacts are for members.See what members get

The data center pipeline

None of the 1 record lists a year online or expected, so the pipeline is shown by developer only.

Figure 1

Who is building in Hunterdon

Data center developers by MW on record. Top 1 of 1.

Comcast 0 MW 1 site
View as table
DeveloperSitesMW
Comcast10
Members see all 1 developer, each campus they own here, and the people who run their site selection and energy procurement.
Source. FieldProspects database: ISO/RTO interconnection queues, EIA-860M and public data center filings, data as of October 8, 2026. Aggregates only. Campus names are for members.

Power generation in the county

22 plants operate inside Hunterdon County, 614.3 MW. The queue adds 39.8 MW across 2 projects, and one of them is past its listed in-service date.

Figure 3

Operating and planned generation by technology

MW in Hunterdon County

OperatingPlanned
Natural GasOperating 512 MW 6 projects
SolarOperating 82.3 MW 15 projects
SolarPlanned 19.8 MW 1 project
Battery StorageOperating 20 MW 1 project
Battery StoragePlanned 20 MW 1 project
View as table
TechnologyStatusProjectsMW
Natural GasOperating6512
SolarOperating1582.3
SolarPlanned119.8
Battery StorageOperating120
Battery StoragePlanned120
Operating: 614.3 MW. Planned: 39.8 MW. Even if every planned project is built, county generation would reach 654.1 MW against 0 MW of data centers.
Source: ISO queues and EIA-860M, via FieldProspects
Figure 4

Planned generation by listed in-service year

MW. Years before 2026 are past due.

Past dueDue 2026 or later
05101520 Snapshot year 20 2022 2023 2024 2025 2026 2027 20 2028
View as table
YearPlanned projectsMW
2022120
202300
202400
202500
202600
202700
2028119.8
1 project, 20 MW, was due before 2026

Hunterdon County against its neighbors

Mercer County has the most data center MW among the neighbors, 119 MW, more than Hunterdon County. 4 of the 4 have more generation operating than data center MW on record.

CountyData center recordsData center MWOperating generation MWPlanned generation MWData center MW per MW operating
Mercer County 1
119
121
171 0.98x
Morris County 3
5
72
0 0.07x
Hunterdon County this page 1
0
614
40 0x
Warren County 0
0
579
333 0x
Somerset County 0
0
67
3 0x

Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.

5 counties shown

What changed since June 4, 2026

3 projects in Hunterdon County moved between the two snapshots. Counts and MW are below; the projects themselves are for members.

Open the change feed
0
added to a queue, 0 MW
0
came online, started construction or signed an interconnection agreement, 0 MW
3
cancelled, dropped or went inactive, 293 MW
0
slipped their in-service date, 0 MW

Every change in Hunterdon County

Project, what changed, technology, MW and the dates that moved, for all 3 changes.

Members only
County: Hunterdon County, NJSince June 4, 2026 3 changes
ProjectChangeTechnologyMWPrevious dateNew date
3 changes behind this preview

Rows are hidden on public pages. Members see the project behind each change, its developer and the dates that moved.

Request access

Every record in Hunterdon County

Campus or project name, developer, status, MW, year and the developer’s contacts, for all 25 records. Filter, sort and export to Excel.

Members only
County: Hunterdon County, NJStatus: all except cancelledSort: MW, largest first 25 records
Project or campusDeveloperStatusMWYearContacts
25 records and 654.1 MW behind this preview

Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.

Request access

Get alerts for Hunterdon County

We email you when a data center or power project in Hunterdon County is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Open every campus, project and contact in Hunterdon County.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.