FieldProspects

Pointe Coupee Parish, Louisiana

Pointe Coupee Parish, Louisiana has 25 power projects in the FieldProspects database: 15 operating plants totaling 2.9 GW and 10 planned projects totaling 3.4 GW. No data center record lists the county. Natural Gas leads with 3.5 GW across 11 projects.

Data as of Grid region: Midcontinent ISO (MISO)Refreshed monthly
25
power projects, planned and operating
3.4GW
planned generation, 10 projects
2.9GW
operating generation, 15 projects
3
planned projects past their listed in-service date
Map

Pointe Coupee Parish and its neighbors

Counties shaded by data center MW on record, planned to operating. 4 of its 7 neighboring counties have pages of their own. The rest are in the member database.

Pointe Coupee no data centers West Feliciana Concordia no data centers St. Landry no data centers West Baton Rouge no data centers Iberville no data centers Avoyelles St. Martin
no data center MWunder 100 MW100 to 1,000 MW1,000 to 5,000 MW5,000 to 15,000 MW15,000 MW or more no page yet

Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers

Headline finding
1.2times

more planned than operating generation in Pointe Coupee Parish. 10 projects in the queue would add 3.4 GW to the 2.9 GW operating today, and 3 of them are past their listed in-service date.

Operating generation2.9 GW
Planned generation3.4 GW

Technology mix

25 projects, 6.2 GW planned and operating

Natural Gas3.5 GW11 projects, 55%
Coal1.3 GW2 projects, 20%
Solar900 MW5 projects, 14%
2 other technologies602.4 MW7 projects, 10%
Which companies own these 25 projects?Project names, developers and contacts are for members.See what members get

Power generation in the county

15 plants operate inside Pointe Coupee Parish, 2.9 GW. The queue adds 3.4 GW across 10 projects, and 3 of them are past their listed in-service date.

Figure 1

Operating and planned generation by technology

MW in Pointe Coupee Parish

OperatingPlanned
Natural GasOperating 1.1 GW 5 projects
Natural GasPlanned 2.3 GW 6 projects
CoalOperating 1.3 GW 2 projects
SolarOperating 450 MW 2 projects
SolarPlanned 450 MW 3 projects
TransmissionPlanned 593 MW 1 project
OilOperating 9.4 MW 6 projects
View as table
TechnologyStatusProjectsMW
Natural GasOperating51,118.8
Natural GasPlanned62,340.9
CoalOperating21,276.9
SolarOperating2450
SolarPlanned3450
TransmissionPlanned1593
OilOperating69.4
Operating: 2.9 GW. Planned: 3.4 GW. If every planned project is built, county generation would reach 6.2 GW.
Source. FieldProspects database: ISO/RTO interconnection queues, EIA-860M and public data center filings, data as of October 8, 2026.
Figure 2

Planned generation by listed in-service year

MW. Years before 2026 are past due.

Past dueDue 2026 or later
01k2k3k Snapshot year 300 2023 150 2024 2025 2026 2027 593 2028 2029 2030 2,341 2031
View as table
YearPlanned projectsMW
20232300
20241150
202500
202600
202700
20281593
202900
203000
203162,340.9
3 projects, 450 MW, were due before 2026

Pointe Coupee Parish against its neighbors

None of the 4 neighboring counties with a page lists a data center record. Iberville Parish has the most operating generation among them, 2.7 GW.

CountyData center recordsData center MWOperating generation MWPlanned generation MWData center MW per MW operating
Pointe Coupee Parish this page 0
0
2,855
3,384 0x
Iberville Parish 0
0
2,683
3,285 0x
Concordia Parish 0
0
192
237 0x
St. Landry Parish 0
0
135
1,117 0x
West Baton Rouge Parish 0
0
58
50 0x

Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.

5 counties shown

What changed since June 4, 2026

1 project in Pointe Coupee Parish moved between the two snapshots. Counts and MW are below; the projects themselves are for members.

Open the change feed
0
added to a queue, 0 MW
1
came online, started construction or signed an interconnection agreement, 150 MW
0
cancelled, dropped or went inactive, 0 MW
0
slipped their in-service date, 0 MW

Every change in Pointe Coupee Parish

Project, what changed, technology, MW and the dates that moved, for all 1 change.

Members only
County: Pointe Coupee Parish, LASince June 4, 2026 1 change
ProjectChangeTechnologyMWPrevious dateNew date
1 change behind this preview

Rows are hidden on public pages. Members see the project behind each change, its developer and the dates that moved.

Request access

Every record in Pointe Coupee Parish

Project name, developer, status, MW, in-service year and the developer’s contacts, for all 25 records. Filter, sort and export to Excel.

Members only
County: Pointe Coupee Parish, LAStatus: all except cancelledSort: MW, largest first 25 records
Project or campusDeveloperStatusMWYearContacts
25 records and 6.2 GW behind this preview

Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.

Request access

Get alerts for Pointe Coupee Parish

We email you when a data center or power project in Pointe Coupee Parish is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Open every campus, project and contact in Pointe Coupee Parish.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.