FieldProspects

Iberville Parish, Louisiana

Iberville Parish, Louisiana has 25 power projects in the FieldProspects database: 17 operating plants totaling 2.7 GW and 8 planned projects totaling 3.3 GW. No data center record lists the county. Natural Gas leads with 5 GW across 17 projects.

Data as of Grid region: Midcontinent ISO (MISO)Refreshed monthly
25
power projects, planned and operating
3.3GW
planned generation, 8 projects
2.7GW
operating generation, 17 projects
3
planned projects past their listed in-service date
Map

Iberville Parish and its neighbors

Counties shaded by data center MW on record, planned to operating. 4 of its 7 neighboring counties have pages of their own. The rest are in the member database.

Pointe Coupee no data centers Iberia East Baton Rouge no data centers Assumption Ascension no data centers West Baton Rouge no data centers Iberville no data centers St. Martin
no data center MWunder 100 MW100 to 1,000 MW1,000 to 5,000 MW5,000 to 15,000 MW15,000 MW or more no page yet

Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers

Headline finding
1.2times

more planned than operating generation in Iberville Parish. 8 projects in the queue would add 3.3 GW to the 2.7 GW operating today, and 3 of them are past their listed in-service date.

Operating generation2.7 GW
Planned generation3.3 GW

Technology mix

25 projects, 6 GW planned and operating

Natural Gas5 GW17 projects, 84%
Solar575 MW3 projects, 10%
Battery Storage200 MW1 project, 3%
3 other technologies189 MW4 projects, 3%
Which companies own these 25 projects?Project names, developers and contacts are for members.See what members get

Power generation in the county

17 plants operate inside Iberville Parish, 2.7 GW. The queue adds 3.3 GW across 8 projects, and 3 of them are past their listed in-service date.

Figure 1

Operating and planned generation by technology

MW in Iberville Parish

OperatingPlanned
Natural GasOperating 2.7 GW 14 projects
Natural GasPlanned 2.3 GW 3 projects
SolarPlanned 575 MW 3 projects
Battery StoragePlanned 200 MW 1 project
TransmissionPlanned 175 MW 1 project
Waste HeatOperating 10 MW 1 project
OilOperating 4 MW 2 projects
View as table
TechnologyStatusProjectsMW
Natural GasOperating142,668.7
Natural GasPlanned32,335.2
SolarPlanned3575
Battery StoragePlanned1200
TransmissionPlanned1175
Waste HeatOperating110
OilOperating24
Operating: 2.7 GW. Planned: 3.3 GW. If every planned project is built, county generation would reach 6 GW.
Source. FieldProspects database: ISO/RTO interconnection queues, EIA-860M and public data center filings, data as of October 8, 2026.
Figure 2

Planned generation by listed in-service year

MW. Years before 2026 are past due.

Past dueDue 2026 or later
05001k1.5k2k Snapshot year 1,075 2025 2026 2027 400 2028 200 2029 1,610 2030
View as table
YearPlanned projectsMW
202531,075.2
202600
202700
20282400
20291200
203021,610
3 projects, 1.1 GW, were due before 2026

Iberville Parish against its neighbors

None of the 4 neighboring counties with a page lists a data center record. Pointe Coupee Parish has the most operating generation among them, 2.9 GW.

CountyData center recordsData center MWOperating generation MWPlanned generation MWData center MW per MW operating
Pointe Coupee Parish 0
0
2,855
3,384 0x
Iberville Parish this page 0
0
2,683
3,285 0x
East Baton Rouge Parish 0
0
832
199 0x
Ascension Parish 0
0
248
0 0x
West Baton Rouge Parish 0
0
58
50 0x

Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.

5 counties shown

What changed since June 4, 2026

2 projects in Iberville Parish moved between the two snapshots. Counts and MW are below; the projects themselves are for members.

Open the change feed
2
added to a queue, 400 MW
0
came online, started construction or signed an interconnection agreement, 0 MW
0
cancelled, dropped or went inactive, 0 MW
0
slipped their in-service date, 0 MW

Every change in Iberville Parish

Project, what changed, technology, MW and the dates that moved, for all 2 changes.

Members only
County: Iberville Parish, LASince June 4, 2026 2 changes
ProjectChangeTechnologyMWPrevious dateNew date
2 changes behind this preview

Rows are hidden on public pages. Members see the project behind each change, its developer and the dates that moved.

Request access

Every record in Iberville Parish

Project name, developer, status, MW, in-service year and the developer’s contacts, for all 25 records. Filter, sort and export to Excel.

Members only
County: Iberville Parish, LAStatus: all except cancelledSort: MW, largest first 25 records
Project or campusDeveloperStatusMWYearContacts
25 records and 6 GW behind this preview

Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.

Request access

Get alerts for Iberville Parish

We email you when a data center or power project in Iberville Parish is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Open every campus, project and contact in Iberville Parish.