FieldProspects

White County, Indiana

White County, Indiana has 0 MW of data centers on record, planned to operating, across 1 record, against 1.8 GW of generation operating inside the county. The queue adds 3.7 GW of planned generation across 25 projects, 7 of them past their listed in-service date.

Data as of Grid region: Midcontinent ISO (MISO)Refreshed monthly
0MW
data centers, planned to operating
1
data center records, not cancelled
0%
of Indiana's data center MW
1.8GW
operating generation, 34 projects
3.7GW
planned generation, 25 projects
0
data center developers active here
Map

White County and its neighbors

Counties shaded by data center MW on record, planned to operating. 6 of its 6 neighboring counties have pages of their own. The rest are in the member database.

Benton no data centers Pulaski no data centers Tippecanoe no data centers White 0 MW Cass no data centers Jasper 675 MW Carroll no data centers
no data center MWunder 100 MW100 to 1,000 MW1,000 to 5,000 MW5,000 to 15,000 MW15,000 MW or more no page yet

Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers

Headline finding
0%

of the generation operating in the county is matched by data center MW on record: 0 MW of data centers against 1.8 GW of plants, with 3.7 GW more planned.

Data centers, planned to operating0 MW
Operating generation1.8 GW
Planned generation3.7 GW

Data centers by status

1 record, 0 MW

Planned0 MW1 record, 0%
Who owns each of the 1 records?Campus names, developers and contacts are for members.See what members get

Power generation in the county

34 plants operate inside White County, 1.8 GW. The queue adds 3.7 GW across 25 projects, and 7 of them are past their listed in-service date.

Figure 3

Operating and planned generation by technology

MW in White County

OperatingPlanned
SolarOperating 550 MW 3 projects
SolarPlanned 1.8 GW 11 projects
WindOperating 1.2 GW 8 projects
WindPlanned 400.2 MW 2 projects
Battery StorageOperating 45 MW 1 project
Battery StoragePlanned 1.3 GW 10 projects
Solar + Storage (Hybrid)Planned 200 MW 1 project
TransmissionPlanned 60 MW 1 project
HydroOperating 7.3 MW 4 projects
Landfill GasOperating 6.4 MW 4 projects
Natural GasOperating 6.4 MW 8 projects
BiomassOperating 6 MW 6 projects
View as table
TechnologyStatusProjectsMW
SolarOperating3550
SolarPlanned111,820
WindOperating81,217.2
WindPlanned2400.2
Battery StorageOperating145
Battery StoragePlanned101,258
Solar + Storage (Hybrid)Planned1200
TransmissionPlanned160
HydroOperating47.3
Landfill GasOperating46.4
Natural GasOperating86.4
BiomassOperating66
Operating: 1.8 GW. Planned: 3.7 GW. Even if every planned project is built, county generation would reach 5.6 GW against 0 MW of data centers.
Source. FieldProspects database: ISO/RTO interconnection queues, EIA-860M and public data center filings, data as of October 8, 2026.
Figure 4

Planned generation by listed in-service year

MW. Years before 2026 are past due. 4 planned projects list no date and are left out.

Past dueDue 2026 or later
05001k1.5k Snapshot year 400 2021 200 2022 50 2023 300 2024 2025 1,110 2026 1,118 2027 300 2028
View as table
YearPlanned projectsMW
20212400.2
20221200
2023150
20243300
202500
202651,110
202771,118
20282300
7 projects, 950.2 MW, were due before 2026

White County against its neighbors

Jasper County has the most data center MW among the neighbors, 675 MW, more than White County. 6 of the 6 have more generation operating than data center MW on record.

CountyData center recordsData center MWOperating generation MWPlanned generation MWData center MW per MW operating
Jasper County 9
675
1,637
2,535 0.41x
White County this page 1
0
1,838
3,738 0x
Benton County 0
0
1,175
430 0x
Cass County 0
0
219
200 0x
Tippecanoe County 0
0
138
100 0x
Carroll County 0
0
12
0 0x
Pulaski County 0
0
3
5,205 0x

Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.

7 counties shown

What changed since June 4, 2026

13 projects in White County moved between the two snapshots. Counts and MW are below; the projects themselves are for members.

Open the change feed
1
added to a queue, 60 MW
2
came online, started construction or signed an interconnection agreement, 400 MW
9
cancelled, dropped or went inactive, 1.4 GW
1
slipped its in-service date, 180 MW

Every change in White County

Project, what changed, technology, MW and the dates that moved, for all 13 changes.

Members only
County: White County, INSince June 4, 2026 13 changes
ProjectChangeTechnologyMWPrevious dateNew date
13 changes behind this preview

Rows are hidden on public pages. Members see the project behind each change, its developer and the dates that moved.

Request access

Every record in White County

Campus or project name, developer, status, MW, year and the developer’s contacts, for all 60 records. Filter, sort and export to Excel.

Members only
County: White County, INStatus: all except cancelledSort: MW, largest first 60 records
Project or campusDeveloperStatusMWYearContacts
60 records and 5.6 GW behind this preview

Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.

Request access

Get alerts for White County

We email you when a data center or power project in White County is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Open every campus, project and contact in White County.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.