FieldProspects

Elkhart County, Indiana

Elkhart County, Indiana has 1.5 GW of data centers on record, planned to operating, across 1 record, against 114 MW of generation operating inside the county. The queue adds 600 MW of planned generation across 4 projects, 2 of them past their listed in-service date.

Data as of Grid region: PJM InterconnectionRefreshed monthly
1.5GW
data centers, planned to operating
1
data center records, not cancelled
8.9%
of Indiana's data center MW
114MW
operating generation, 15 projects
600MW
planned generation, 4 projects
1
data center developers active here
Map

Elkhart County and its neighbors

Counties shaded by data center MW on record, planned to operating. 3 of its 5 neighboring counties have pages of their own. The rest are in the member database.

Noble LaGrange no data centers Marshall no data centers Elkhart 1.5 GW Kosciusko St Joseph 3.2 GW
no data center MWunder 100 MW100 to 1,000 MW1,000 to 5,000 MW5,000 to 15,000 MW15,000 MW or more no page yet

Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers

Headline finding
13.2times

more data center MW than operating generation in the county. Elkhart County's own plants cover 7.6% of the load on record, and the planned pipeline adds 600 MW.

Data centers, planned to operating1.5 GW
Operating generation114 MW
Planned generation600 MW

Data centers by status

1 record, 1.5 GW

Planned1.5 GW1 record, 100%
Who owns each of the 1 records?Campus names, developers and contacts are for members.See what members get

The data center pipeline

None of the 1 record lists a year online or expected, so the pipeline is shown by developer only.

Figure 1

Who is building in Elkhart

Data center developers by MW on record. Top 1 of 1.

Takanock 1.5 GW 1 site
View as table
DeveloperSitesMW
Takanock11,500
Members see all 1 developer, each campus they own here, and the people who run their site selection and energy procurement.
Source. FieldProspects database: ISO/RTO interconnection queues, EIA-860M and public data center filings, data as of October 8, 2026. Aggregates only. Campus names are for members.

Power generation in the county

15 plants operate inside Elkhart County, 114 MW. The queue adds 600 MW across 4 projects, and 2 of them are past their listed in-service date.

Figure 3

Operating and planned generation by technology

MW in Elkhart County

OperatingPlanned
Battery StoragePlanned 600 MW 4 projects
SolarOperating 101.5 MW 2 projects
Landfill GasOperating 4.8 MW 6 projects
BiomassOperating 4.3 MW 4 projects
HydroOperating 3.4 MW 3 projects
View as table
TechnologyStatusProjectsMW
Battery StoragePlanned4600
SolarOperating2101.5
Landfill GasOperating64.8
BiomassOperating44.3
HydroOperating33.4
Operating: 114 MW. Planned: 600 MW. Even if every planned project is built, county generation would reach 714 MW against 1.5 GW of data centers.
Source: ISO queues and EIA-860M, via FieldProspects
Figure 4

Planned generation by listed in-service year

MW. Years before 2026 are past due. 2 planned projects list no date and are left out.

Past dueDue 2026 or later
0100200300 300 2024
View as table
YearPlanned projectsMW
20242300
2 projects, 300 MW, were due before 2026

Elkhart County against its neighbors

St Joseph County has the most data center MW among the neighbors, 3.2 GW, more than Elkhart County. 1 of the 3 have more generation operating than data center MW on record.

CountyData center recordsData center MWOperating generation MWPlanned generation MWData center MW per MW operating
St Joseph County 39
3,202
1,012
2,614 3.2x
Elkhart County this page 1
1,500
114
600 13.2x
Marshall County 0
0
14
2,000 0x
LaGrange County 0
0
0
425 no operating MW

Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.

4 counties shown

What changed since June 4, 2026

1 project in Elkhart County moved between the two snapshots. Counts and MW are below; the projects themselves are for members.

Open the change feed
0
added to a queue, 0 MW
1
came online, started construction or signed an interconnection agreement, 100 MW
0
cancelled, dropped or went inactive, 0 MW
0
slipped their in-service date, 0 MW

Every change in Elkhart County

Project, what changed, technology, MW and the dates that moved, for all 1 change.

Members only
County: Elkhart County, INSince June 4, 2026 1 change
ProjectChangeTechnologyMWPrevious dateNew date
1 change behind this preview

Rows are hidden on public pages. Members see the project behind each change, its developer and the dates that moved.

Request access

Every record in Elkhart County

Campus or project name, developer, status, MW, year and the developer’s contacts, for all 20 records. Filter, sort and export to Excel.

Members only
County: Elkhart County, INStatus: all except cancelledSort: MW, largest first 20 records
Project or campusDeveloperStatusMWYearContacts
20 records and 2.2 GW behind this preview

Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.

Request access

Get alerts for Elkhart County

We email you when a data center or power project in Elkhart County is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Open every campus, project and contact in Elkhart County.