Eddy County, New Mexico

Eddy County, New Mexico has 4 power projects in the FieldProspects database: 2 operating plants totaling 30.1 MW and 2 planned projects totaling 135 MW. No data center record lists the county. Battery Storage leads with 115 MW across 1 project.

Data as of Grid region: Southwest Power Pool (SPP)Refreshed monthly
4
power projects, planned and operating
135MW
planned generation, 2 projects
30.1MW
operating generation, 2 solar projects
1
planned project past its listed in-service date
Map

Eddy County and its neighbors

Counties shaded by data center MW on record, planned to operating. 3 of its 3 neighboring counties have pages of their own. The rest are in the member database.

Otero no data centers Eddy no data centers Lea 7 GW Chaves 1.3 GW
no data center MWunder 100 MW100 to 1,000 MW1,000 to 5,000 MW5,000 to 15,000 MW15,000 MW or more no page yet

Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers

Headline finding
4.5times

more planned than operating generation in Eddy County. 2 projects in the queue would add 135 MW to the 30.1 MW operating today, and one of them is past its listed in-service date.

Operating generation30.1 MW
Planned generation135 MW

Technology mix

4 projects, 165.1 MW planned and operating

Battery Storage115 MW1 project, 70%
Solar50.1 MW3 projects, 30%
Which companies own these 4 projects?Project names, developers and contacts are for members.See what members get

Power generation in the county

2 plants operate inside Eddy County, 30.1 MW of solar. The queue adds 135 MW across 2 projects, and one of them is past its listed in-service date.

Figure 1

Operating and planned generation by technology

MW in Eddy County

OperatingPlanned
Battery StoragePlanned 115 MW 1 project
SolarOperating 30.1 MW 2 projects
SolarPlanned 20 MW 1 project
View as table
TechnologyStatusProjectsMW
Battery StoragePlanned1115
SolarOperating230.1
SolarPlanned120
Operating: 30.1 MW. Planned: 135 MW. If every planned project is built, county generation would reach 165.1 MW.
Source. FieldProspects database: ISO/RTO interconnection queues, EIA-860M and public data center filings, data as of October 8, 2026.
Figure 2

Planned generation by listed in-service year

MW. Years before 2026 are past due.

Past dueDue 2026 or later
050100150 Snapshot year 20 2023 2024 2025 2026 2027 2028 2029 115 2030
View as table
YearPlanned projectsMW
2023120
202400
202500
202600
202700
202800
202900
20301115
1 project, 20 MW, was due before 2026

Eddy County against its neighbors

Lea County has the most data center MW among the neighbors, 7 GW. 1 of the 3 have more generation operating than data center MW on record.

CountyData center recordsData center MWOperating generation MWPlanned generation MWData center MW per MW operating
Lea County 2
7,000
1,844
1,753 3.8x
Chaves County 1
1,250
194
300 6.4x
Otero County 0
0
193
200 0x
Eddy County this page 0
0
30
135 0x

Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.

4 counties shown

What changed since June 4, 2026

1 project in Eddy County moved between the two snapshots. Counts and MW are below; the projects themselves are for members.

Open the change feed
1
added to a queue, 20 MW
0
came online, started construction or signed an interconnection agreement, 0 MW
0
cancelled, dropped or went inactive, 0 MW
0
slipped their in-service date, 0 MW

Every change in Eddy County

Project, what changed, technology, MW and the dates that moved, for all 1 change.

Members only
County: Eddy County, NMSince June 4, 2026 1 change
ProjectChangeTechnologyMWPrevious dateNew date
1 change behind this preview

Rows are hidden on public pages. Members see the project behind each change, its developer and the dates that moved.

Request access

Every record in Eddy County

Project name, developer, status, MW, in-service year and the developer’s contacts, for all 4 records. Filter, sort and export to Excel.

Members only
County: Eddy County, NMStatus: all except cancelledSort: MW, largest first 4 records
Project or campusDeveloperStatusMWYearContacts
4 records and 165.1 MW behind this preview

Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.

Request access

Get alerts for Eddy County

We email you when a data center or power project in Eddy County is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Open every campus, project and contact in Eddy County.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.