FieldProspects

Madison County, Mississippi

Madison County, Mississippi has 1.8 GW of data centers on record, planned to operating, across 26 records, against 100 MW of generation operating inside the county. The queue adds 1.8 GW of planned generation across 9 projects, 5 of them past their listed in-service date.

Data as of Grid region: Midcontinent ISO (MISO)Refreshed monthly
1.8GW
data centers, planned to operating
26
data center records, not cancelled
77.9%
of Mississippi's data center MW
100MW
operating generation, 1 solar project
1.8GW
planned generation, 9 projects
1
data center developers active here
Map

Madison County and its neighbors

Counties shaded by data center MW on record, planned to operating. 3 of its 6 neighboring counties have pages of their own. The rest are in the member database.

Leake Scott no data centers Rankin Hinds 0 MW Madison 1.8 GW Yazoo Attala no data centers
no data center MWunder 100 MW100 to 1,000 MW1,000 to 5,000 MW5,000 to 15,000 MW15,000 MW or more no page yet

Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers

Headline finding
18.4times

more data center MW than operating generation in the county. Madison County's own plants cover 5.4% of the load on record, and the planned pipeline adds 1.8 GW.

Data centers, planned to operating1.8 GW
Operating generation100 MW
Planned generation1.8 GW

Data centers by status

26 records, 1.8 GW

Operating619.2 MW9 records, 34%
Under construction481.6 MW7 records, 26%
Planned743 MW10 records, 40%
Who owns each of the 26 records?Campus names, developers and contacts are for members.See what members get

The data center pipeline

26 records list a year online or expected, from 2025 to 2028. The largest expected additions are 853.1 MW listed for 2027 and 371.5 MW for 2028.

Figure 1

Data center MW by year online or expected

Records not cancelled, by listed year. 2026 onward is planned or under construction.

Through 20252026 and later
02505007501k Snapshot year 344 2025 275 2026 853 2027 372 2028
View as table
YearRecordsMW
20255344
20264275
202712853
20285372
Source. FieldProspects database: ISO/RTO interconnection queues, EIA-860M and public data center filings, data as of October 8, 2026. 26 records with a year
Figure 2

Who is building in Madison

Data center developers by MW on record. Top 1 of 1.

Amazon 1.8 GW 26 sites
View as table
DeveloperSitesMW
Amazon261,844
Members see all 1 developer, each campus they own here, and the people who run their site selection and energy procurement.
Aggregates only. Campus names are for members.

Power generation in the county

1 plant operate inside Madison County, 100 MW of solar. The queue adds 1.8 GW across 9 projects, and 5 of them are past their listed in-service date.

Figure 3

Operating and planned generation by technology

MW in Madison County

OperatingPlanned
Natural GasPlanned 819.4 MW 2 projects
SolarOperating 100 MW 1 project
SolarPlanned 507 MW 4 projects
Battery StoragePlanned 300 MW 2 projects
Solar + Storage (Hybrid)Planned 170 MW 1 project
View as table
TechnologyStatusProjectsMW
Natural GasPlanned2819.4
SolarOperating1100
SolarPlanned4507
Battery StoragePlanned2300
Solar + Storage (Hybrid)Planned1170
Operating: 100 MW. Planned: 1.8 GW. Even if every planned project is built, county generation would reach 1.9 GW against 1.8 GW of data centers.
Source: ISO queues and EIA-860M, via FieldProspects
Figure 4

Planned generation by listed in-service year

MW. Years before 2026 are past due.

Past dueDue 2026 or later
05001k1.5k Snapshot year 100 2021 2022 2023 507 2024 2025 2026 2027 1,189 2028
View as table
YearPlanned projectsMW
20211100
202200
202300
20244507
202500
202600
202700
202841,189.4
5 projects, 607 MW, were due before 2026

Madison County against its neighbors

None of the 3 neighboring counties with a page lists a data center record. Hinds County has the most operating generation among them, 604.6 MW.

CountyData center recordsData center MWOperating generation MWPlanned generation MWData center MW per MW operating
Madison County this page 26
1,844
100
1,796 18.4x
Hinds County 1
0
605
846 0x
Attala County 0
0
551
200 0x
Scott County 0
0
175
275 0x

Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.

4 counties shown

What changed since June 4, 2026

2 projects in Madison County moved between the two snapshots. Counts and MW are below; the projects themselves are for members.

Open the change feed
2
added to a queue, 819.4 MW
0
came online, started construction or signed an interconnection agreement, 0 MW
0
cancelled, dropped or went inactive, 0 MW
0
slipped their in-service date, 0 MW

Every change in Madison County

Project, what changed, technology, MW and the dates that moved, for all 2 changes.

Members only
County: Madison County, MSSince June 4, 2026 2 changes
ProjectChangeTechnologyMWPrevious dateNew date
2 changes behind this preview

Rows are hidden on public pages. Members see the project behind each change, its developer and the dates that moved.

Request access

Every record in Madison County

Campus or project name, developer, status, MW, year and the developer’s contacts, for all 36 records. Filter, sort and export to Excel.

Members only
County: Madison County, MSStatus: all except cancelledSort: MW, largest first 36 records
Project or campusDeveloperStatusMWYearContacts
36 records and 3.7 GW behind this preview

Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.

Request access

Get alerts for Madison County

We email you when a data center or power project in Madison County is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Open every campus, project and contact in Madison County.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.