FieldProspects

Rapides Parish, Louisiana

Rapides Parish, Louisiana has 430 MW of data centers on record, planned to operating, across 2 records, against 1.8 GW of generation operating inside the county. The queue adds 598.6 MW of planned generation across 8 projects. That is 5.1% of Louisiana's data center MW.

Data as of Grid region: Midcontinent ISO (MISO)Refreshed monthly
430MW
data centers, planned to operating
2
data center records, not cancelled
5.1%
of Louisiana's data center MW
1.8GW
operating generation, 10 projects
598.6MW
planned generation, 8 projects
1
data center developers active here
Map

Rapides Parish and its neighbors

Counties shaded by data center MW on record, planned to operating. 1 of its 7 neighboring counties have pages of their own. The rest are in the member database.

Evangeline no data centers Grant Vernon LaSalle Rapides 430 MW Natchitoches Allen Avoyelles
no data center MWunder 100 MW100 to 1,000 MW1,000 to 5,000 MW5,000 to 15,000 MW15,000 MW or more no page yet

Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers

Headline finding
24%

of the generation operating in the county is matched by data center MW on record: 430 MW of data centers against 1.8 GW of plants, with 598.6 MW more planned.

Data centers, planned to operating430 MW
Operating generation1.8 GW
Planned generation598.6 MW

Data centers by status

2 records, 430 MW

Under construction430 MW2 records, 100%
Who owns each of the 2 records?Campus names, developers and contacts are for members.See what members get

The data center pipeline

2 records list a year online or expected, from 2027 to 2027. The largest expected additions are 430 MW listed for 2027.

Figure 1

Data center MW by year online or expected

Records not cancelled, by listed year. 2026 onward is planned or under construction.

Through 20252026 and later
0200400600 430 2027
View as table
YearRecordsMW
20272430
Source. FieldProspects database: ISO/RTO interconnection queues, EIA-860M and public data center filings, data as of October 8, 2026. 2 records with a year
Figure 2

Who is building in Rapides

Data center developers by MW on record. Top 1 of 1.

Applied Digital 430 MW 2 sites
View as table
DeveloperSitesMW
Applied Digital2430
Members see all 1 developer, each campus they own here, and the people who run their site selection and energy procurement.
Aggregates only. Campus names are for members.

Power generation in the county

10 plants operate inside Rapides Parish, 1.8 GW. The queue adds 598.6 MW across 8 projects.

Figure 3

Operating and planned generation by technology

MW in Rapides Parish

OperatingPlanned
Petroleum CokeOperating 703.8 MW 1 project
CoalOperating 558 MW 1 project
SolarPlanned 550 MW 2 projects
Natural GasOperating 510.6 MW 8 projects
HydroPlanned 48.6 MW 6 projects
View as table
TechnologyStatusProjectsMW
Petroleum CokeOperating1703.8
CoalOperating1558
SolarPlanned2550
Natural GasOperating8510.6
HydroPlanned648.6
Operating: 1.8 GW. Planned: 598.6 MW. Even if every planned project is built, county generation would reach 2.4 GW against 430 MW of data centers.
Source: ISO queues and EIA-860M, via FieldProspects
Figure 4

Planned generation by listed in-service year

MW. Years before 2026 are past due.

Past dueDue 2026 or later
0100200300400 Snapshot year 350 2026 200 2027 49 2028
View as table
YearPlanned projectsMW
20261350
20271200
2028648.6
No planned project is past its listed year

Rapides Parish against its neighbors

None of the 1 neighboring county with a page lists a data center record. Evangeline Parish has the most operating generation among them, 922.8 MW.

CountyData center recordsData center MWOperating generation MWPlanned generation MWData center MW per MW operating
Rapides Parish this page 2
430
1,772
599 0.24x
Evangeline Parish 0
0
923
450 0x

Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.

2 counties shown

What changed since June 4, 2026

1 project in Rapides Parish moved between the two snapshots. Counts and MW are below; the projects themselves are for members.

Open the change feed
0
added to a queue, 0 MW
0
came online, started construction or signed an interconnection agreement, 0 MW
1
cancelled, dropped or went inactive, 280 MW
0
slipped their in-service date, 0 MW

Every change in Rapides Parish

Project, what changed, technology, MW and the dates that moved, for all 1 change.

Members only
County: Rapides Parish, LASince June 4, 2026 1 change
ProjectChangeTechnologyMWPrevious dateNew date
1 change behind this preview

Rows are hidden on public pages. Members see the project behind each change, its developer and the dates that moved.

Request access

Every record in Rapides Parish

Campus or project name, developer, status, MW, year and the developer’s contacts, for all 20 records. Filter, sort and export to Excel.

Members only
County: Rapides Parish, LAStatus: all except cancelledSort: MW, largest first 20 records
Project or campusDeveloperStatusMWYearContacts
20 records and 2.8 GW behind this preview

Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.

Request access

Get alerts for Rapides Parish

We email you when a data center or power project in Rapides Parish is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Open every campus, project and contact in Rapides Parish.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.