FieldProspects

Caddo Parish, Louisiana

Caddo Parish, Louisiana has 780 MW of data centers on record, planned to operating, across 12 records, against 1 GW of generation operating inside the county. The queue adds 493.5 MW of planned generation across 4 projects, 1 of them past its listed in-service date.

Data as of Grid region: Southwest Power Pool (SPP)Refreshed monthly
780MW
data centers, planned to operating
12
data center records, not cancelled
9.3%
of Louisiana's data center MW
1GW
operating generation, 7 projects
493.5MW
planned generation, 4 projects
1
data center developers active here
Map

Caddo Parish and its neighbors

Counties shaded by data center MW on record, planned to operating. 2 of its 3 neighboring counties have pages of their own. The rest are in the member database.

Red River DeSoto no data centers Bossier 390 MW Caddo 780 MW
no data center MWunder 100 MW100 to 1,000 MW1,000 to 5,000 MW5,000 to 15,000 MW15,000 MW or more no page yet

Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers

Headline finding
74%

of the generation operating in the county is matched by data center MW on record: 780 MW of data centers against 1 GW of plants, with 493.5 MW more planned.

Data centers, planned to operating780 MW
Operating generation1 GW
Planned generation493.5 MW

Data centers by status

12 records, 780 MW

Planned780 MW12 records, 100%
Who owns each of the 12 records?Campus names, developers and contacts are for members.See what members get

The data center pipeline

12 records list a year online or expected, from 2028 to 2031. The largest expected additions are 195 MW listed for 2028 and 195 MW for 2031.

Figure 1

Data center MW by year online or expected

Records not cancelled, by listed year. 2026 onward is planned or under construction.

Through 20252026 and later
050100150200 195 2028 195 2029 2030 195 2031
View as table
YearRecordsMW
20283195
20293195
20303195
20313195
Source. FieldProspects database: ISO/RTO interconnection queues, EIA-860M and public data center filings, data as of October 8, 2026. 12 records with a year
Figure 2

Who is building in Caddo

Data center developers by MW on record. Top 1 of 1.

Stack Infrastructure 780 MW 12 sites
View as table
DeveloperSitesMW
Stack Infrastructure12780
Members see all 1 developer, each campus they own here, and the people who run their site selection and energy procurement.
Aggregates only. Campus names are for members.

Power generation in the county

7 plants operate inside Caddo Parish, 1 GW of natural gas and solar. The queue adds 493.5 MW across 4 projects, and one of them is past its listed in-service date.

Figure 3

Operating and planned generation by technology

MW in Caddo Parish

OperatingPlanned
Natural GasOperating 977 MW 6 projects
SolarOperating 72.5 MW 1 project
SolarPlanned 438.5 MW 3 projects
Solar + Storage (Hybrid)Planned 55 MW 1 project
View as table
TechnologyStatusProjectsMW
Natural GasOperating6977
SolarOperating172.5
SolarPlanned3438.5
Solar + Storage (Hybrid)Planned155
Operating: 1 GW. Planned: 493.5 MW. Even if every planned project is built, county generation would reach 1.5 GW against 780 MW of data centers.
Source: ISO queues and EIA-860M, via FieldProspects
Figure 4

Planned generation by listed in-service year

MW. Years before 2026 are past due.

Past dueDue 2026 or later
0100200300400 Snapshot year 74 2024 2025 2026 2027 365 2028 2029 55 2030
View as table
YearPlanned projectsMW
2024173.5
202500
202600
202700
20282365
202900
2030155
1 project, 73.5 MW, was due before 2026

Caddo Parish against its neighbors

Bossier Parish has the most data center MW among the neighbors, 390 MW, 50% of Caddo Parish's. 1 of the 2 have more generation operating than data center MW on record.

CountyData center recordsData center MWOperating generation MWPlanned generation MWData center MW per MW operating
Caddo Parish this page 12
780
1,050
494 0.74x
Bossier Parish 6
390
0
1,699 no operating MW
DeSoto Parish 0
0
172
240 0x

Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.

3 counties shown

Every record in Caddo Parish

Campus or project name, developer, status, MW, year and the developer’s contacts, for all 23 records. Filter, sort and export to Excel.

Members only
County: Caddo Parish, LAStatus: all except cancelledSort: MW, largest first 23 records
Project or campusDeveloperStatusMWYearContacts
23 records and 2.3 GW behind this preview

Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.

Request access

Get alerts for Caddo Parish

We email you when a data center or power project in Caddo Parish is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Open every campus, project and contact in Caddo Parish.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.