FieldProspects

Beauregard Parish, Louisiana

Beauregard Parish, Louisiana has 5 power projects in the FieldProspects database: 1 operating plant totaling 61.5 MW and 4 planned projects totaling 840 MW. No data center record lists the county. Solar leads with 640 MW across 3 projects. 1 planned project is past its listed in-service date.

Data as of Grid region: Midcontinent ISO (MISO)Refreshed monthly
5
power projects, planned and operating
840MW
planned generation, 4 projects
61.5MW
operating generation, 1 biomass project
1
planned project past its listed in-service date
Map

Beauregard Parish and its neighbors

Counties shaded by data center MW on record, planned to operating. 2 of its 4 neighboring counties have pages of their own. The rest are in the member database.

Calcasieu no data centers Vernon Jefferson Davis no data centers Allen Beauregard no data centers
no data center MWunder 100 MW100 to 1,000 MW1,000 to 5,000 MW5,000 to 15,000 MW15,000 MW or more no page yet

Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers

Headline finding
13.7times

more planned than operating generation in Beauregard Parish. 4 projects in the queue would add 840 MW to the 61.5 MW operating today, and one of them is past its listed in-service date.

Operating generation61.5 MW
Planned generation840 MW

Technology mix

5 projects, 901.5 MW planned and operating

Solar640 MW3 projects, 71%
Battery Storage200 MW1 project, 22%
Biomass61.5 MW1 project, 7%
Which companies own these 5 projects?Project names, developers and contacts are for members.See what members get

Power generation in the county

1 plant operate inside Beauregard Parish, 61.5 MW of biomass. The queue adds 840 MW across 4 projects, and one of them is past its listed in-service date.

Figure 1

Operating and planned generation by technology

MW in Beauregard Parish

OperatingPlanned
SolarPlanned 640 MW 3 projects
Battery StoragePlanned 200 MW 1 project
BiomassOperating 61.5 MW 1 project
View as table
TechnologyStatusProjectsMW
SolarPlanned3640
Battery StoragePlanned1200
BiomassOperating161.5
Operating: 61.5 MW. Planned: 840 MW. If every planned project is built, county generation would reach 901.5 MW.
Source. FieldProspects database: ISO/RTO interconnection queues, EIA-860M and public data center filings, data as of October 8, 2026.
Figure 2

Planned generation by listed in-service year

MW. Years before 2026 are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 200 2024 2025 2026 500 2027 2028 140 2029
View as table
YearPlanned projectsMW
20241200
202500
202600
20272500
202800
20291140
1 project, 200 MW, was due before 2026

Beauregard Parish against its neighbors

None of the 2 neighboring counties with a page lists a data center record. Calcasieu Parish has the most operating generation among them, 4 GW.

CountyData center recordsData center MWOperating generation MWPlanned generation MWData center MW per MW operating
Calcasieu Parish 0
0
4,016
1,919 0x
Beauregard Parish this page 0
0
62
840 0x
Jefferson Davis Parish 0
0
0
615 no operating MW

Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.

3 counties shown

What changed since June 4, 2026

1 project in Beauregard Parish moved between the two snapshots. Counts and MW are below; the projects themselves are for members.

Open the change feed
0
added to a queue, 0 MW
0
came online, started construction or signed an interconnection agreement, 0 MW
1
cancelled, dropped or went inactive, 200 MW
0
slipped their in-service date, 0 MW

Every change in Beauregard Parish

Project, what changed, technology, MW and the dates that moved, for all 1 change.

Members only
County: Beauregard Parish, LASince June 4, 2026 1 change
ProjectChangeTechnologyMWPrevious dateNew date
1 change behind this preview

Rows are hidden on public pages. Members see the project behind each change, its developer and the dates that moved.

Request access

Every record in Beauregard Parish

Project name, developer, status, MW, in-service year and the developer’s contacts, for all 5 records. Filter, sort and export to Excel.

Members only
County: Beauregard Parish, LAStatus: all except cancelledSort: MW, largest first 5 records
Project or campusDeveloperStatusMWYearContacts
5 records and 901.5 MW behind this preview

Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.

Request access

Get alerts for Beauregard Parish

We email you when a data center or power project in Beauregard Parish is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Open every campus, project and contact in Beauregard Parish.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.