FieldProspects

Bent County, Colorado

Bent County, Colorado has 7 power projects in the FieldProspects database: 6 operating plants totaling 80.6 MW and 1 planned project totaling 1.8 MW. No data center record lists the county. Wind leads with 75 MW across 1 project. No planned project is past its listed in-service date.

Data as of Grid region: WAPA Rocky MountainRefreshed monthly
7
power projects, planned and operating
1.8MW
planned generation, 1 project
80.6MW
operating generation, 6 projects
0
planned projects past their listed in-service date
Map

Bent County and its neighbors

Counties shaded by data center MW on record, planned to operating. 4 of its 5 neighboring counties have pages of their own. The rest are in the member database.

Otero no data centers Baca no data centers Las Animas no data centers Prowers no data centers Kiowa Bent no data centers
no data center MWunder 100 MW100 to 1,000 MW1,000 to 5,000 MW5,000 to 15,000 MW15,000 MW or more no page yet

Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers

Headline finding
2%

of the county's operating generation is in the queue as new capacity: 1.8 MW planned across 1 project against 80.6 MW operating.

Operating generation80.6 MW
Planned generation1.8 MW

Technology mix

7 projects, 82.4 MW planned and operating

Wind75 MW1 project, 91%
Oil5.6 MW5 projects, 7%
Solar1.8 MW1 project, 2%
Which companies own these 7 projects?Project names, developers and contacts are for members.See what members get

Power generation in the county

6 plants operate inside Bent County, 80.6 MW of wind and oil. The queue adds 1.8 MW across 1 project.

Figure 1

Operating and planned generation by technology

MW in Bent County

OperatingPlanned
WindOperating 75 MW 1 project
OilOperating 5.6 MW 5 projects
SolarPlanned 1.8 MW 1 project
View as table
TechnologyStatusProjectsMW
WindOperating175
OilOperating55.6
SolarPlanned11.8
Operating: 80.6 MW. Planned: 1.8 MW. If every planned project is built, county generation would reach 82.4 MW.
Source. FieldProspects database: ISO/RTO interconnection queues, EIA-860M and public data center filings, data as of October 8, 2026.
Figure 2

Planned generation by listed in-service year

MW. Years before 2026 are past due.

Past dueDue 2026 or later
00.511.52 2 2027
View as table
YearPlanned projectsMW
202711.8
No planned project is past its listed year

Bent County against its neighbors

None of the 4 neighboring counties with a page lists a data center record. Prowers County has the most operating generation among them, 247.9 MW.

CountyData center recordsData center MWOperating generation MWPlanned generation MWData center MW per MW operating
Prowers County 0
0
248
5 0x
Las Animas County 0
0
179
202 0x
Bent County this page 0
0
81
2 0x
Otero County 0
0
12
5 0x
Baca County 0
0
8
0 0x

Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.

5 counties shown

What changed since June 4, 2026

1 project in Bent County moved between the two snapshots. Counts and MW are below; the projects themselves are for members.

Open the change feed
1
added to a queue, 1.8 MW
0
came online, started construction or signed an interconnection agreement, 0 MW
0
cancelled, dropped or went inactive, 0 MW
0
slipped their in-service date, 0 MW

Every change in Bent County

Project, what changed, technology, MW and the dates that moved, for all 1 change.

Members only
County: Bent County, COSince June 4, 2026 1 change
ProjectChangeTechnologyMWPrevious dateNew date
1 change behind this preview

Rows are hidden on public pages. Members see the project behind each change, its developer and the dates that moved.

Request access

Every record in Bent County

Project name, developer, status, MW, in-service year and the developer’s contacts, for all 7 records. Filter, sort and export to Excel.

Members only
County: Bent County, COStatus: all except cancelledSort: MW, largest first 7 records
Project or campusDeveloperStatusMWYearContacts
7 records and 82.4 MW behind this preview

Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.

Request access

Get alerts for Bent County

We email you when a data center or power project in Bent County is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Open every campus, project and contact in Bent County.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.