Fairbanks North Star, Alaska
Fairbanks North Star, Alaska has 29 power projects in the FieldProspects database, all of them operating, 386.3 MW in total, with nothing in the queue. No data center record lists the county. Oil leads with 238.8 MW across 13 projects.
Fairbanks North Star and its neighbors
Counties shaded by data center MW on record, planned to operating. 3 of its 3 neighboring counties have pages of their own. The rest are in the member database.
Data center records planned, under construction and operating, data as of October 8, 2026.Hover a county for its numbers
of operating generation across 29 plants, and nothing in the interconnection queue for Fairbanks North Star.
Technology mix
29 projects, 386.3 MW planned and operating
Power generation in the county
29 plants operate inside Fairbanks North Star, 386.3 MW. Nothing is in the queue for the county.
Operating and planned generation by technology
MW in Fairbanks North Star
View as table
| Technology | Status | Projects | MW |
|---|---|---|---|
| Oil | Operating | 13 | 238.8 |
| Coal | Operating | 15 | 107.5 |
| Battery Storage | Operating | 1 | 40 |
Fairbanks North Star against its neighbors
None of the 3 neighboring counties with a page lists a data center record. Denali has the most operating generation among them, 117.4 MW.
| County | Data center records | Data center MW | Operating generation MW | Planned generation MW | Data center MW per MW operating |
|---|---|---|---|---|---|
| Fairbanks North Star this page | 0 | 0 | 0x | ||
| Denali | 0 | 0 | 0x | ||
| Southeast Fairbanks | 0 | 0 | 0x | ||
| Yukon Koyukuk | 0 | 0 | 0x |
Data center MW counts records planned, under construction and operating. Generation is inside the county only. Neighbors without a page have fewer than three projects on record.
4 counties shownEvery record in Fairbanks North Star
Project name, developer, status, MW, in-service year and the developer’s contacts, for all 29 records. Filter, sort and export to Excel.
| Project or campus | Developer | Status | MW | Year | Contacts |
|---|---|---|---|---|---|
Rows are hidden on public pages. Members see every field and can export up to 1,000 rows a month on Solo, unlimited on Unlimited.
Get alerts for Fairbanks North Star
We email you when a data center or power project in Fairbanks North Star is added, changes status, signs an interconnection agreement or slips its date. One email per snapshot, only when something changed.
Open every campus, project and contact in Fairbanks North Star.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.